Strategic Planning Process

Departmental Objectives for

City Commission Goals and Priorities

(updated 06/10/04)

 

CITY COMMISSION GOAL

Economic Development: Promoting the economic development of Lawrence to provide varied work and business opportunities.

 

Administrative Services

Status: Fully executed ordinances and resolutions going back to 1990 have been electronically stored.  City Commission meeting minutes for meetings since 2000 are also now available on the City’s website.

 

City Manager’s Office

Status:  A study session was held on December 10th for the City Commission to discuss the tax abatement policy.  As a follow-up item to that study session, the Chamber provided a presentation on the use of incentives in the economic development process or “ED 101” at a study session in February, 2004.

Status:   City staff is participating in tours of existing industrial companies.  Ongoing meetings regarding the Farmland property have included various staff members from the City Manager’s office. Additionally, staff is meeting with Chamber staff in order to appropriately present Chamber alternatives for Commission consideration.

Status:  Minimum Standards review is in final stages with Aviation Advisory Board.  Next step is to provide for public comment prior to sending recommended standards to the City Commission for their review/approval. T-hangars are being marketed to regional aviation community.

 

Finance

Status: Presented City Commission with an analysis of first quarter revenues and expenditures during the City Commission meeting on May 4th.  Provided City Commission with a projection of property tax supported funds during budget study session on May 19th.

Status:  This objective was met, by the billing in November of payment in-lieu of property taxes.  The County did not notify the Finance Department of any in-lieu of payments that were not received.

 

Fire & Medical

Status:  Providing an initial review of building plans for new construction and for remodels to ensure compliance with Uniform Fire Code and Life Safety Code.  During 2003 the Prevention Division performed 112 building plan reviews and 221 site plan reviews. In addition we provide businesses with annual hazard inspections in an effort to identify hazards for the building owner.  Annual inspections of these occupancies reduce the number and severity of fire hazards, thereby reducing the frequency of incidents that could potentially effect production and layoff of employees. During 2003 the Operations Division performed 2554 business inspections

Status: Implementing 1995 Public Safety Plan and CIP as part of maintaining the current ISO Class 2 rating.  The City Commission approved the issuance of general obligation bonds in the amount of $5,000,000 for design and construction of Station No. 5 at 19th and Stewart Ave (Resolution 6547).  In addition the City Commission has approved funding the design of Station No. 4 at 22nd and Wakarusa.

 

Parks & Recreation

Status:  Adding wide variety of new classes and events to program offerings. Over 20 new programs are being offered for summer.   Staff is continuing to solicit national type events to facilities such as Indoor Aquatic Center and Clinton Lake Softball Complex. State and national level softball tournaments are scheduled at the CLSC this spring and summer, including Kansas High School 6-A Girls Championship, AFA National Girls Fast-Pitch Qualifying Tournament, AFA National Youth Fast-Pitch Tournament (anticipate about 100 teams) and USSSA National Qualifying Slow-Pitch Softball Tournament. Added new skate park on court area at Deerfield Park.

 

 

 

Public Works

Status: Major infrastructure projects completed:  31st & Nieder, 6th & Kasold, 11th Street, 31st & Iowa, N. Michigan; Wakarusa, Overland, and Congressional Drive north of 6th. Drainage improvement projects:  The final phase of the 21st and Barker project, box culverts at 19th and Learnard, will be completed this summer. The 13th and Oregon stream daylighting project started in February and will be completed this winter. The 15th and Lawrence Avenue streambank stabilization project is scheduled for construction this fall. The 23rd and Haskell water quality basin is scheduled for construction this winter.  The Chipperfield ditch is complete.  Major streets in various stages of development: [under construction]:  O’Connell Road (23rd to 31st).  Bids have been completed and construction planning is in progress for West 6th Street  (Wakarua to the SLT), Folks Road (6th to Harvard).  [design stage]: George Williams Way (6th to Harvard); Peterson Road (Kasold to Monterey Way); Monterey Way (north and south);.  Maintenance  projects for 2004:  Overlay Program Phase I is under contract; KLINK Project – 6th Street (Arizona to Arkansas) is under contract; Concrete repair program is under contract.  Traffic Calming projects:  19th and Barker construction to be completed August 1, 2004; Harvard Road, between Monterey Way and Wakarusa, is in the design stage 

 

Utilities

Status:  Proposals being considered to upgrade three older lift stations.  Black & Veatch will complete the new rate study which will consider rate structure for water and wastewater and provide different options based on user categories. Staff provided general information to Black and Veatch. Preliminary revenue projections were provided to Management staff during April and a meeting was held with B&V to review the data. The rate study estimated completion date is mid May 2004.   A meeting has been scheduled for February 11, 2004 with the City Commission to consider the rate study and other issues. Water production to May for 20041,218,414,000, gallons is 0.32% lower than 2003.  The chemical cost for Kaw is $.13 per 1000 gallons and Clinton is $.11 per 1000 gallons.  2003 cost was $0.13 and $.13 respectively.  The overall unit chemical cost is slightly lower than 2003 to date. The YTD expenditures with 33% of the year complete:   of the Administration and Quality Control O/M budget for 2004: Administration – 24%; Quality Control – 30%. The YTD expenditures of the Water Utility O/M budget for 2004:  Kaw – 30%; Clinton32%; Distribution – 27%. The YTD expenditures of the Wastewater Utility O/M budget for 2003: WWTP – 42%; Sanitary Sewer -22%. Continue with preventative maintenance activities at each plant and in the distribution/ collection system.  Lift station and WWTP control and monitoring integration is underway with six lift stations complete and additional work ongoing on the other stations. In 2004, the Distribution Division will continue to evaluate expenditures for water distribution maintenance and repair and identify areas of possible reduction such as fuel, equipment and maintenance expenses.


CITY COMMISSION GOAL

Planned Growth: Encouraging growth that protects our environment, neighborhoods, and cultural features while benefiting all of our citizens.

 

City Manager’s Office

Status:  Staff has completed their review/update of the current development policy and it is being formatted into ordinance form.  Staff continues to attend and provide information for the Mayor’s APF task force meetings.

 

Finance

Status:  The Finance Department closed on the spring debt issuance on May 27th.  A general obligation bond in the amount of $3,520,000 and a temporary note in the amount of $10,115,000 were issued to finance capital projects.

 

Fire/Medical

Status:  Implementation of the department’s facilities plan which includes the construction of Station No. 5 (19th and Stewart) and the relocation of Station No. 4 to 22nd and Wakarusa to assist in meeting the necessary response times as outlined in NFPA 1710 Standards. A contract has been awarded to Sabatini and Associates Architects for design and construction of Station No. 5.  Construction is to begin January 2005 with estimated completion January 2006. In addition a design contract has been awarded to Sabatini and Associates Architects for the design of Station No. 4.

Status: During 2003 the Prevention Division performed 112 building plan reviews and 221 site plan reviews.

 

Information Systems

Status:  GIS continues to be an important tool for infrastructure planning in these departments.  GIS has now further expanded and is used by all but one department.

Status:  Information contained in the GIS is being used to report infrastructure data to meet GASB requirements.  This goal has been met unless the Finance department requires additional information in the future.

Status:  Updated aerial photography, planimetric data and contours have been received from M.J. Harden, Inc. and installed on the City GIS system.

Status: An agreement with the Data Access Support Center (DASC) at the Kansas Geological Survey was made to web host City of Lawrence GIS data.  The GIS steering committee agreed upon the content to be presented on the website, and all requested modifications to the system have been completed.  The system is now linked in as part of the City’s Egov website offerings.

 

Legal Services

Status: Ongoing staff effort in this area, including the following improvement projects: legal and management support for implementation of development policy; legal support for innovative planned growth initiatives, such as deferred special assessments report, sign code improvements, area annexation proposals for O’Connell Road and possibly Miller/Wells acres area.

 

Neighborhood Resources

Status:  A revised draft is awaiting review by the Legal Services department.

Status:  Staff is completing a draft ordinance to license building, framing and concrete contractors in Lawrence.  Representatives of the LHBA have had opportunity for comment and suggestion during the development of the draft.  Estimated completion time scheduled July 2004. 

Status:  Flow charts describing the various processes are viewable online via the Neighborhood Resources Department website.

 

Parks & Recreation

Status:  Purchased four acre site in Stonegate III area for future park and green space; completed Clinton Lake Master Plan to help preserve open space, wildlife habitat and unique vistas; working with planners to encourage developers to dedicate trail easements for future  neighborhood connections to parks.

Status:  Completed long-term master plan for the 1612 acre regional park at Clinton Lake, including adding 97 acres to lease. Contracted with Landplan Engineering to design a Plaza on this site and working with the Sesquicentennial Commission for fund-raising for Sesquicentennial Point. Began development of a 15 acre Rotary Arboretum; received $25,000 contribution from local Rotary Clubs. 

Status:  Attended study session regarding Water/Wastewater Master Plans; staff is following UGA expansion issue and potential impacts to parks system.

 

Planning

Status:  The City Commission received the Adequate Public Facilities report.  A Mayor’s task force is currently exploring this issue.  See updated status below.

Status:   The PITF has developed a White Paper to identify issues discussed and the progression of the committee in studying the issues.  Their next meeting is June 1st where the task force will look at a revision to the White Paper, an outline of a PowerPoint Document for posting on the city website, and a more detailed report on consultant services.

Status:  The Planning Commission recommended version of the Zoning Ordinance is posted on the planning office website [www.lawrenceplanning.org]. The Consultants are adding the illustrations into the document.  An implementation plan for phasing of the change from existing to new zoning code is being written in preparation of the City Commission’s consideration in June.

 

Public Transit

Status:  The Public Transit Administrator (PTA) attends site plan review meetings on a regular basis, works with developers, and participates in public meetings being held by the Planning Department.  PTA serves on the Planning Department’s Technical Advisory Committee and is a partner in the Unified Planning Work Program.  Additionally, ongoing work is taking place with Public Works (Traffic Engineering and Street Divisions) and Utilities Departments to coordinate public infrastructure improvements with transit projects.

 

Public Works

Status:    The Engineering Division (City Engineer and Assistant, Stormwater Engineer, and Traffic Engineer) reviews all development proposals to ensure planned development is consistent with current requirements.  These are on-going efforts for the department.  All reviews are completed within two weeks of submittal.  Engineering Division has worked with neighborhoods on various traffic calming plans.   Policies established: Bike lane requirements and Speed Hump policy.  The Traffic Impact Study requirements will be adopted by the City Commission.  A Traffic Calming Policy is in draft form.  The North Lawrence Drainage Study is underway, with a projected completion in April, 2005. This study will outline a long-range plan for stormwater management, with specific focus on flood control for existing homes, system maintenance planning and standards for development north to the county line.

Status:  Quality, timely, and appropriate inspections for infrastructure are on-going responsibilities for the Engineering Division.  Four engineering inspectors completed training with KDOT LPA / ACI programs over the winter.  Staff provided inspection on State project at 6th and Kasold, and plan to conduct inspection on the O’Connell Road project.

Status:  The Engineering Division continues to implement the 2001 stormwater pollution prevention ordinance. This work includes plan review and field inspection of construction activities, and repeated contact with individual homebuilders. Enforcement actions are coordinated with the Neighborhood Resources Department. In April 2004, the Stormwater Division and the Waste Reduction and Recycling Division joined forces to bring Lawrence the largest Earth Day celebration to date.  A parade down Massachusetts Street kicked off the event which took place in South Park. This year’s Earth Day celebration included a water festival titled ‘April Showers to Water Towers’ which focused on water quality and pollution prevention. The event was partially funded with $2,500 in grants from outside agencies. 

 

Utilities

Status:  Master plan completed and adopted by CC. Rate Study underway and completed preliminary meeting with Black and Veatch to review revenue requirements. Finance Department is directing the project. 

Status:  Awaiting direction on Adequate Public Facilities policy and revised Development Policy. Staff has met with the City Manager’s Office and Public Works to provide formal comments to the previous version of the Development Financing Policy.  Staff has also attended several meetings of the Public Improvements Task Force (PITF) to gather knowledge of the topics.  Finally, a meeting was held with a representative from the City of Olathe to understand Olathe’s policies concerning development financing.


CITY COMMISSION GOAL

Community Building: Creating social capital and celebrating our heritage.

 

Administrative Services

Status:  The 2004 Diversity Training for City Staff titled “The Generation Mix” was held in February and March.  The training objectives included identifying and discussing the four different generations in our workplace (customers and co-workers) to better understand how socio-historical events influenced each generation; and to encourage and enable all of us to draw on each persons unique skills, perspectives, and values.

 

City Manager’s Office

Status: City Manager met with Rep. Moore and Ryun in March at the National League of Cities meeting.

Status:  City staff is working with the Aviation Advisory Board on planning for the 75th anniversary of the Lawrence Municipal Airport, to be held in August.

 

Human Relations/Human Resources

Status:  The Martin Luther King, Jr. Celebration was conducted on January 17 – 19, 2004. The event was well attended.  Guest speakers for this year’s event included Mark Mangino, KU football coach, and Lisa Miree, Miss Black USA.  A leadership seminar for the Utilities Department was conducted in November, 2003. The Department is currently engaged in an expanded community outreach effort.

Status:  A Core Mediation Training course is being conducted on March 9 – 11, 2004 and marketing efforts to the local community are in progress. Fair Housing seminars are in the planning stage and are to be conducted during on April 23 & 24, 2004. The Equal Opportunity Law Update Seminar (Oct. 2004) is in the early planning stages. Partnership Initiative funds have been requested and approved by HUD to provide accessibility compliance support for local housing providers.

 

Parks & Recreation

o       Provide opportunity for wide-range community input and support of the master plan for the leased area adjacent to Clinton Lake, including input from the Sesquicentennial Commission for a public commemoration of the City’s sesquicentennial.

Status:  Working with the Sesquicentennial Commission to begin fund raising for Sesquicentennial Point. 

o       Continue to organize community events and festivals which celebrate our diverse heritage.

Status:  Several staff members directly involved in planning for 150th birthday celebration in Lawrence including June 25-29 Chautauqua in South Park, Sept. 18th parade and time capsule burial at Sesquicentennial Point on Sept. 19th. Staff is involving Parks and Recreation Advisory Board where possible.  Developing partnerships with Haskell Indian Nations University, Downtown Lawrence Association and Douglas County Historical Society. Worked with DLA to promote additional flower plantings in downtown.  Recently became promise partner with Douglas County Promise organization to emphasize services to youth and partnered with Bert Nash for a 5-K run and Coach Bill Self for a golf tournament to help our youth scholarship program. 

 

Planning

Status:  Planning, through the Historic Preservation effort, provides support for the Commission’s action in regard to this goal. This is an on-going practice. No fourth quarter work has been directed toward this effort.


CITY COMMISSION GOAL

Environmental Issues: Integrating the environment into our decisions as we work towards a sustainable city.

 

City Manager’s Office

Status:  City Manager’s office is participating in discussions with Kansas Water Office regarding allocation issues from Clinton Reservoir. Operations within the City organization continue to be compliant with appropriate regulations.

 

Fire & Medical

Status:  Implement the regional response plans that have been jointly developed by Douglas County Emergency Management, Lawrence-Douglas County Health Department and Lawrence-Douglas County Fire Medical.  These plans identify the fire services role as first responders as domestic defenders.  In addition we will continue to apply for federal grants in an attempt to obtain state-of-the-art equipment for hazardous materials and weapons of mass destruction response.  . Douglas County received $325,949 in 2003 grants and we are currently reviewing 2004 grant funding in the amount of $424,022 toward fire service response and $145,486 toward law enforcement response capabilities.  Twenty-four members of the department received Hazardous Materials Technician certification through a program offered by the International Association of Fire Fighters (IAFF).    

 

Information Systems

Status:  Utility Billing online has been available since June 2003 and allows citizens to view current and past utility bill information.   Online recreation class enrollment was launched on August 3, 2003 to permit citizens to enroll in recreation classes and make payments online.  An initial rollout of the employee intranet is being used to provide information to employees and continues to be refined. An Internet mapping site has been developed by the KU Data Access and Support Center (DASC) and now hosts selected City GIS information that is accessible from the City’s website.  The online building permits and inspections system has been installed and was launched on the City website in early February 2004.

 

Parks & Recreation

Status:  Working with Kansas Wildlife and Parks Dept. to improve fishing opportunities at the Pat Dawson Billings Nature Area. 

Status:  Ongoing staff effort in this area.

Status:  Completed eagle sanctuary area at the Prairie Park Nature Center and have received both a rehabilitated Bald Eagle and Golden Eagle for display and use in educational programs.

 

Public Works

Status:  The Stormwater Division continues to implement all phases of this program. The Stormwater Quality Technician monitors construction sites, responds to pollution reports and manages public education activities. Engineering inspectors assist with construction site management, the Waste Reduction and Recycling Division provides public education support, and the Street Maintenance Division operates the street sweeping program. All aspects of the Phase II permit will be in place prior to the 2008 target date established by the EPA.   

Status:  The compost site opened for use March 1 of 2004.    

Status:  Solid Waste crews began collecting mixed office paper from City Hall last year.  The city-wide pilot program has ended and is now a fully operational service which includes 54 pick up locations weekly, serving 99 businesses. 

Status: Nine neighborhoods are participating in the pilot paper yard waste bag program in 2004.  They are Centennial, Prairie Meadows, East Lawrence, Quail Run, Western Hills, Perry Park, Sunset Hills, Pinckney, and Sunflower.  320 Households from the pilot neighborhoods are participating.  An educational process to facilitate discontinuance of plastic bags for yard waste will be undertaken in 2004. Plastic bags will no longer be allowed for yard waste use in 2005.

Status:  The horizontal baler has been purchased and installed.  Project is complete.

Status:  Pilot program is in place for alternative fuel vehicles with 3 hybrids and 9 flex fuel vehicles in the City fleet. We continue to evaluate and track hybrid technology as well as alternative fuel development, with the goal of making the fleet as environmentally friendly as is feasible and practical.  The Fleet Manager is evaluating the new hybrid trucks / utility vehicles.

Status:  The facility is now available by appointment generally Monday through Saturday.  Over 1,400 customers were served by appointment in 2003. 

 

Utilities

Status:  The force main contract portion of this project is complete and has been tested by the contractor.  The plant improvements/pump station contract is approximately 98% complete.  Substantial completion occurred on December 31, 2003 and final start up is presently underway.  Compliance for the NPDES permit is March, 2004.  The City Commission has been updated on this project.  Applications for the monofil permit at the Waste Water Treatment Plant have been sent to the appropriate agencies.  Lime Residuals project is complete and dealing with warranty issues.

Status:  The Watershed Restoration and Protection Strategy Core Working Group is now in the process of forming an Upper Wakarusa WRAPS Advisory Committee (UWAC).   The Core Group will continue to function as the main work group.  The UWAC will be comprised of central stakeholders and interested parties perhaps including landowners.  An initial UWAC "invitational" is planned in the fall.

Status:  The Consumer Confidence Report will be mailed out with the water bills to the customer in June to meet the July 1st deadline.  The Department of Utilities continues to be in compliance with all pertinent regulations. Staff is coordinating efforts with HINU and PR to improve the Wakarusa lift station appearance. Application of odor control chemicals to migrate odors is currently taking place on a trial basis upstream of the station.

 


CITY COMMISSION GOAL

Neighborhood Planning: Improving the livability of all Lawrence neighborhoods.

 

City Manager’s Office

Status: Responding to ongoing requests for information and maintaining dialogue with neighborhoods in relationship to complaint tracking.  Providing periodic inspection result updates to neighborhoods regarding Rental Inspection and Zoning Code Enforcement programs. 

 

Fire & Medical

Status:  Continuing to establish a “fire safe” rapport as part of our multi-family inspection program to educate tenants and landlords on fire safety practices (including exit drills in the home and the importance of smoke and carbon monoxide alarms).  During 2003, the Operations Division conducted 1512 multi-family inspections.

Status: Operations Division members conducted 55 school education programs.

 

Information Systems

Status:  A new building permit system has been installed and is operational.

Status:  Two critical ISDN routers in City Hall that connect city computer facilities to all outlying facilities have been replaced with a new Cisco router.  This new router also expands to accommodate additional facilities as the need arises.  A new tape backup system has also been installed that has significantly shortened the data backup time of the City’s computer servers.  Additionally the new backup system has proven to be much more reliable than the replaced system.

 

 

 

Legal Services

Status:  Ongoing staff effort in this area, including review of possible additional efforts for fine collection activities.

 

Neighborhood Resources

Status:  This program receives rental applications on a regular basis, in addition new rental units are identified by use of an automated program aimed at identifying rental units in single-family zoning districts.  Numerous code violations have been identified and corrected since the inception of the program, thus improving the safety and livability of Lawrence neighborhoods.  

 

Parks & Recreation

Status:  Mark Hecker and Ernie Shaw now attending bi-weekly operations meeting with other department to coordinate/discuss projects, programs, etc. Implemented agreement with Douglas County for shared maintenance of Broken Arrow Park (city-county park).

Status:  Ongoing staff effort in this area. Currently working with the  Neighborhood Resources Dept. to help improve both Brook Creek and Clinton Park. Working with neighborhood associations to help renovate Brook Creek and Clinton Parks. Finalized landscape plan for Haskell Indian Nations University cemetery area with City and HINU cooperation.

Status:  Have installed over 1200 trees since program inception in 2003. Adjusted fees after review of street tree ordinance.

 

Planning

Status:    The Historic Resources Commission approved the revised Preservation Plan on May 20th.  The Plan will be placed on future City and County Commission agendas for receipt. The only action required by City or County Commissions is initiation of the Executive Summary as an amendment to Horizon 2020.

Status:  The Executive Summary portion of the Comprehensive Plan was written with the intent that it be a revision to Chapter 7 in Horizon 2020.

Status:  The Zoning Regulations are in the public forum now being discussed, reviewed, and modifications recommended.  The Subdivision Regulations will enter the public forum in November for the same type of review, discussion and public comment listening sessions. The Zoning Regulations are included in the draft zoning code.  The Subdivision Regulations will include language that accommodates and takes into consideration existing platted lots and typical street frontages and yard to lot/street relationships in the older, more established neighborhoods that are near in the urban core (6th Street to 23rd Street, Iowa to Haskell Avenue).

 

Police

Status:  Mobile data computer development and installation continues with seven Traffic Unit vehicles completed, and ten patrol units in process.  This is part of the overall $400,000 grant to the Sheriff’s office to build the infrastructure for mobile data communication county-wide.  It is a multi-year project because of the cost of equipping emergency vehicles in the fleet.  The department continues its technology development with scanning and electronic communications technology to relieve the backlogs that have plagued the front office staff.  Digital imaging technology now extends to the Douglas County District Attorney’s Office to move towards a less paper oriented transfer of police investigative records.  We have implemented a project to computerize self-initiated activities of officers that are now unrecorded by the Computer Aided Dispatch system.  This development will better reflect the volume of work conducted by officers.

Status:  Complaints concerning parking, noise issues, and minor thefts continue to drive neighborhood demands for service.  We have utilized the web based crime statistics model to provide access to Uniform Crime Reporting data for individuals or neighborhood groups. And we continue to work to prioritize our call response while providing adequate resources for serious crimes and complaints in our community.  A reorganization of our Crime Analysis Unit is underway to provide additional statistical modeling of activities in Lawrence for use at the command level.  This statistical modeling may assist in prioritizing and directing police resources.

 

Public Transit

Status:  Seventeen additional shelters installed.  Surveys received from drivers about placement of 14 remaining shelters.  Route Sign Master Plan completed through Route 6.  Amenities Committee is working on transfer station and 9th and Mass renovation plans.  Bus cut out for 23rd and Harper (southeast on 23rd) intersection being bid – bids due June 8th.  Currently exploring another cut out at the same corner – northeast on Harper.

 

Public Works

Status:  Pothole repair is an on-going activity.  New equipment allows for hot asphalt placement for more permanent pothole repair in cold weather. 

Increase frequency of street sweeping. 

Status:  If all three units are operational, we are running the sweepers each work day as weather conditions permit.

Status:  The stormwater maintenance crew continues to focus on catch basin replacement and continual debris removal. Channel re-grading projects are scheduled for cold weather periods. A CDBG project to improve drainage on Funston Avenue in North Lawrence has been completed. 

Status:  2003 Sidewalk Repair Program was completed.  The 2004 program has been suspended due to funding shortfalls in the Gas Tax Fund.

Status:  Annual inspection for 2003 completed successfully.  Two major projects in planning stage: Maple Street lift station (short-term project) and underpass pump systems (long-term project).

Status:  The 21st and Barker project and the 13th and Oregon project will both be completed this year. This brings the total to 12 completed projects from the list of 41 recommended in 1996. The next major project is anticipated to start construction in 2006.

Status:  Alley clean-up and neighborhood events such as North Lawrence and Pinckney have been conducted in 2003 and are being conducted in 2004.  Significant departmental efforts are focused on managing move-in, move-out wastes during the turnover of rental units (May/June and July / August) and return of students to campus housing.

 

Utilities

Status:  The Water Treatment Manager at the Kaw Plant continues to run semi-annual corrosion studies on the distribution system.  The latest study ended on November 24, 2003.  The 2003 waterline improvement projects were completed, including E. 17th Street (NH to Barker), Rhode Island (15th to 17th), 8th Street (Ky. to NH), and Haskell (Lynn to E. 19th St.) and Jayhawk Blvd.  RFP’s for the design of 2004 waterline improvement projects were sent out, reviewed and engineers selected by staff.  The design has started and staff anticipates construction bids in spring of 2004. Bids have been accepted on the 2004 waterline projects and all projects have been awarded and contract is underway. Replacement of the water lines on New Jersey, from 11th to 14th will be especially effective in reducing "red water" calls from that area. Replacement of the water lines on 10th and 11th streets in the downtown area will continue the goal of upgrading the water distribution system in the core downtown area. In addition, projects on 9th street, Rockledge to Schwarz RD and in the vicinity of Barker and Pawnee will improve reliability and fire protection. To improve the reliability and fire protection in the area, water lines were replaced in 2003 by city crews on Nebraska St., Dakota St., and the 2300 block of Vermont, and Moundview Dr., from Rockledge to Crestline. Moundview Dr., from Crestline to Century Dr., will be replaced by City crews in 2004. Selected areas of North Lawrence with undersized water lines will also be replaced by City crews in 2004. 

Status:  Implementation of revised CIP to include continued efforts for rehabilitation of aging lines and manholes within the system for 2004 at same level of effort as in previous years.  

Status:  Staff has developed a policy for addressing issues with one aspect of the existing cross connection control program; this is currently in the review phase. The distribution system flushing program continues to concentrate on preventing possible water quality concerns in new subdivisions and service areas that are served by dead-end water distribution lines.

Status:  Samples are currently being obtained at strategic locations in the distribution system on a daily basis.  Water quality information gathered from the testing of these samples provides a database that will be used to analyze the results and correlate with other distribution system data.  Additionally, staff has checked into other potential monitoring applications that are being used in the water industry.


CITY COMMISSION GOAL

Downtown Development: Protecting the integrity of downtown while maintaining it as a unique community resource.

 

City Manager’s Office

Status:  A preliminary report has been provided for the City Commission.  A study session was held in February to review additional staff research on this topic.

Status:  A short-range plan document has been developed in coordination with Public Works, Parks & Recreation, and Utilities departments.

Status:  Currently under staff review.

 

Fire & Medical

Status:  Provide life safety checks of all life hazard occupancies in the downtown area.  These inspections are conducted by members of our Night Consultant program.  Routine inspections during high occupancy time frames are made to check occupant loads, exiting and life safety requirements thus protecting patrons of these businesses.  Our night consultants conducted 930 life safety inspections during 2003.  We are currently developing a response plan to the Public and Work Place Smoking Restriction Ordinance.

Status:  Provide annual hazard inspections of all downtown businesses to identify and correct fire hazards, thus preserving the historic and unique structures of this community. 100% of all downtown business is inspected annually.

 

Parks & Recreation

Status:  Adding landscaping as funds are available. New landscaping has been completed at Lawrence Arts Center. Staff is coordinating landscaping efforts with Downtown Lawrence Association, utilizing plans from both entities and involving more business employees in planting flowers. Staff has contracted the painting of light poles on Mass. St. and installed bike racks.

Status:  Brown Bag Concert series at 9th and Mass., traditional Wednesday Night Band Concerts and Movies in the Park in South Park beginning for summer. Continuing special events such as Art in the Park and Fall Arts and Crafts Festival downtown. Cooperating with Sesquicentennial Comm. for June 25-29 Chautauqua in South Park and June 19th Juneteenth Celebration and Lawrence Jaycees for July 4th fireworks in Burcham Park.

 

Planning

Status:  Chapter 6, the Commercial Uses chapter of Horizon 2020 has been amended. A reprinting of Horizon 2020 has been proofed and sent to the printers. This reprinting incorporates the revisions to the commercial chapter, the Growth Management Chapter [UGA boundaries], and the Transportation Chapter [Major Thoroughfares Maps], which until this time have only been available as separate chapter updates.  The consolidated update to Horizon 2020 is posted at: www.lawrenceplanning.org.

 

Police

Status:  The Department continues to assign a patrol unit to a district comprised exclusively of downtown Lawrence (district 127).  The current service levels required by the growing number of street-people and associated complaints make the district very busy.  The police interventions generated by patrons in the drinking establishments downtown continue to challenge our resources. 

 

Public Works

Status:  On-going alley clean-ups (weekly), parking lot trash (daily), graffiti removal (as needed).  Curbs and crosswalk projects are established annually.  Staff is coordinating with Utilities Department regarding waterline installation and street repair.  The Department is reviewing issues with the continued viability of the current downtown lighting system.  One alley has been identified for reconstruction in the 2004 work plan, provided adequate funding is available.

 

Utilities

Status:  Continue Rehabilitation of sanitary sewers in older areas of town including: Downtown, Pinckney and East Lawrence neighborhoods. Waterlines in downtown and the surrounding area continue to be included on the priority list of water mains to be replaced each year.  Engineering services for 2004 waterline improvement projects were started in October that includes:  10th St., Tenn. to NH; 11th St., Tenn. to Mass.; and Vermont St., 9th to 11th.     Maps of improvements and future work have been provided to the City Manager’s office. A timetable for the replacement of the downtown Massachusetts Street water line will be developed. It is the goal of the department to begin design and detail planning in mid to late 2004.  This will include public input from downtown businesses and property owners.

 

 


CITY COMMISSION GOAL

Transportation: Improving access for all citizens.

 

City Manager’s Office

Status:  Communications Coordinator working with new Marketing Coordinator to enhance public awareness and accessibility efforts.

 

Parks & Recreation

Status:  Ongoing staff effort in this area.  Staff representative attends Bicycle Advisory board meetings.

Status:  A bus route adjustment to access Prairie Park Nature Center is scheduled to be added in August, 2004.

 

Planning

Status:  The Plan has been completed, published, and is posted on the department website [www.lawrenceplanning.org]. 

Status:  A draft document will be presented to the City Commission at their 13th or 20th meeting. The draft document will be posted on the planning website for the public’s access prior to the City Commission’s consideration.

Status: These two maps have been approved and adopted by both Governing Bodies and the Planning Commission. The final step, approval of a joint ordinance/resolution by the Governing Bodies prior to publication and revision of the document was approved on 12.30.03.  Publication of this joint ordinance/resolution will make the revisions effective. The revised maps can be found on the planning department’s website [www.lawrenceplanning.org].

 

Police

Status:  The traffic unit is operational with all personnel selected and trained.  Equipment been delivered.  The Traffic Unit Sergeant has been coordinating with other City departments to improve overall efficiencies in areas such as the speed monitoring sled.  The second year of the Traffic Unit will end in October, 2003.   Annual statistics continue to exceed our grant projections.

 

Public Transit

Status:  Marketing coordinator becoming familiar with system and position.  Currently working with graphic designer for a new 18 month print, radio and tv campaign.  Working with a graphic designer/cartographer to update and reprint route guides with approved changes.  Currently we are implementing the T-Splash program with Parks & Recreation. Recommendation forthcoming related to half-fares for K-12 students and some fare alternative for HINU students.  Meeting being held on May 26th with Lori Tapahonso, Executive Assistant/Public Information Officer of HINU to discuss fare alternatives and ways to market the transit system on campus.  Marketing Coordinator is working on two HINU projects currently.  Work beginning on our October Communities in Motion promotion event.  Summer promotion planned with the LAZER.  Work beginning on back-to-school promotions.  Travel Training in final stages of development and hopeful that first class will be held this fall. Increased presence in newsletters.

Status:  PTAC recommended and City Commission approved continuation of the “T” sticker program with KU on Wheels – increase to $25 annual, $15 semester.  “T” picked up service to Legends – KU on Wheels dropped direct service to campus.  Attendance at upcoming Universities and Transit Conference put on by American Public Transportation Association by Public Transit Administrator.

 

Public Works

Status:   Pavement management functions are included in the Assistant City Engineer’s position.  He is currently researching and establishing a system of rating criteria.  A presentation on the status of the program was made to the City Commission in the fall, 2003.  Rating of pavement began in February, 2004.  The goal is to develop preliminary evaluations and condition assessments of 50% of pavements by end-of-summer.

Status:   The 2004 crack-sealing program will focus on the following priorities:  N. 2nd, 23rd (Barker to Harper), airport runway (new), remainder of North Lawrence, and Massachusetts (11th to 23rd).  A chip seal project is planning for contract in 2004.

Status:   The 2004 overlay Program Phase I and a concrete repair project are under contract.     Maintenance projects will be scaled back significantly in 2004 due to budget restraints.

Status:   Intersections of 15th and El Dorado Drive and a section of 15th and Kasold have been reconstructed in concrete.  The intersection of Clinton Parkway and Inverness was “white topped.”  The curb and gutter/overlay program will be reduced due to the 2004 budget considerations.


CITY COMMISSION GOAL

Service Delivery: Provide excellent city services consistent with resources available.

 

Administrative Services

Status: 1) As recommended in the 2003 Compensation Study Final Report, staff has developed separate pay plans for Police, Fire/Medical, and all other City staff for recommended implementation in 2005; 2) A comprehensive review of employee paid time off we will done later this year (a report to the Commission is likely in September or October); 3) Later this month Staff will be issuing a request for proposals for the City’s prescription drug coverage.

Status: In February, Staff presented 2003 workers compensation, general liability, and auto liability claims information to the Management Team and also presented the information to several departments during staff meetings.

Status: Staff is continuing to use the prototype/working draft Intranet to distribute employee information, including distribution of the City Employee Newsletter “The Phoenix”; Messages from the City Manager; and benefits and safety training related information.

Status: Administrative Services staff is continuing to review/edit drafts of the above-mentioned policies.

City Manager’s Office

Status:  Staff from this office is working closely with Utilities department staff and the consultant to fashion a rate study for the City Commission’s consideration that will address the proposed capital improvement projects from the recently completed Water and Wastewater Master Plans.  Additionally, staff is working with the consultant and Police department staff in completing that department’s resource plan.

 

Fire & Medical

Status: The Fire Agency Accreditation Program is an Accreditation Organization of the Commission on Fire Accreditation, International, International City Managers Association (ICMA) and Insurance Service Organization (ISO).  The department Accreditation Task Force is currently involved in a “Self Assessment”.  The goal of the self assessment is to achieve excellence in order to provide continuous quality improvement and enhancement of service delivery to our community.

Status:  Station No. 5 design and construction documents are being prepared by Sabatini and Associates Architects.  Station No. 4 design has begun which will reflect the construction and design features of Station No. 2.  We will be asking the city commission to approve construction of Station No. 4 during FY 2005.

 

Human Relations

Status:  The Department, in cooperation with the Personnel Division, made available a Supervisor Training Seminar, conducted by attorneys from Foulston Siefkin LLP on January 20, 2004. The Department is sponsoring a Core Mediation Training Class on March 9-11, 2004.  The Department has recently augmented its training library by purchasing videotapes on customer service, leadership and negotiation skills. In addition, the Department has upgraded its audio/visual equipment (which is available to all City departments). In-service diversity training is being conducted in January and February 2004 for all City employees. This year’s topic is Cross-Generational Communication.

Information Systems

Status:  After discussion and a trial run of the commission web-based agenda packets, this egov project went live during the January 13, 2004 commission meeting.  Agenda packet materials may be viewed and/or downloaded from the City’s website.     Two other egov projects recently added to the City’s website are online building permit/inspection data, and GIS Internet mapping.  The online building permit/inspection system allows permit-holders to enter a permit number and PIN on the website to retrieve a record of permit information and inspection activity to-date.  The GIS Internet mapping project permits viewing of selected GIS mapping layers including streets, neighborhoods, schools, plats, parcels, and aerial photography.   The final project identified from the E-Gov Strategic Implementation plan is online job applications.  A search for acceptable software is currently underway, and installation of an online job application system is targeted for 2004.  A number of additional potential E-gov projects have been discussed by the E-gov committee that will be considered in 2005 and beyond.

 

Neighborhood Resources

Status:  This project is complete.  The building permit software program is currently in use and inspectors result inspections from the field on PDA handheld computers.  

 

Parks & Recreation

 

Police

Status:  The five detectives have been selected and are at work.  The evening shift has not been pursued.  The department is reviewing a reorganization of the Crime Analysis Unit now under the direction of the detective division.  The retirement of the detective sergeant and the supervisory reorganization prompted by the opening is in process.

 

Public Transit

Status:  PTAC has determined that a major overhaul to route system may be necessary.  A sub-committee is currently working on this review and a report to City Commission will be forthcoming. Any approved recommendations will be incorporated into the long-range planning document.

Status:  Sub-committee appointed to develop system-wide goals or standards for operation.  Where appropriate, the standards will reflect growth of our system to maturity.  Also where appropriate, performance standards will be developed that mirror the penalties/incentives of our contract with the transit provider.  Performance standards will be measured and reported, have consequences and action plans for improvement, and benchmarks to compare to other similar transit agencies.  A tentative goal has been set to bring this document to PTAC at our August meeting.

Status:  A monthly checklist and oversight document has been created to monitor provider’s adherence to transit standards.

 

Public Works

Status:  This is an on-going goal and project.  The department continually reviews operations to achieve cost savings and service improvements.

 

Utilities

Status: Draft Water Conservation Plan is now under staff review.  Inserts were mailed with the water bills in April on water conservation.  Also a message was added to the June water bill on conservation.  We plan to determine what level of emphasis is needed for the community concerning water conservation.  A series of semi-monthly meeting has been scheduled to discuss department conservation planning for 2005 and beyond with an emphasis on educating the public regarding water conservation.

Status: Master Plans include sections concerning: water source supply, projects and funding etc., which will continue to part of the capital budget process. Currently preparing and implementing plans for the Phase II of the Clinton Plant expansion. Kaw Operations and Restroom Improvements has been bid and awarded to BA Green.

Status: GIS software is being used as we develop databases for information management.  For example we are hyperlinking recorded utility easements to the digital map product via databases which should allow us to access a copy of the original documents.   Other GIS efforts include: tracking water quality complaints, taste & odor calls, and tracking age of water and sanitary sewer pipes.

Status: Continue to promote excellent City services with general reductions in resources by providing oversight and follow up for resource management.  We meet with staff concerning budget expenditures, communication and morale issue etc.  We have developed the Department of Utilities Employees’ Awards for Excellence Program as a management tool to better recognize employee contributions.

Status:  Staff has attended water and wastewater schools/ workshops provided by University of Kansas, AWWA and Fort Scott Community College.  Received Supervisory Training in Excellence Program (STEP) in-service training from KU’s Human Resources Department over the past 6 months; Staff attended Lawrence Human Relation/ Human Resources Department Annual Employment Law Update. GIS staff attended Magic Show Regional GIS Conference in Kansas City in April 2004 which offered a series of workshops and presentation related to GIS Programs.  Appropriate department staff attended the KU City Managers Conference at KU in May 2004.