Memorandum

City of Lawrence

Department of Public Works

 

TO:

Mike Wildgen

 

FROM:

Chuck Soules

 

CC:

Dave Corliss, Debbie Van Saun, Terese Gorman, Ed Ogle, Roger Coffey, Chris Stewart

 

Date:

September 27, 2004

 

RE:

19th & Barker Roundabout

Project No. 56-CP12-901(C)

Change Orders #2 and #3

 

Project Status.  During the completion of the 19th & Barker Roundabout Project, two change orders have been developed to encompass various changes in project scope and/or fulfilled agreements made during property acquisition.  Change Order #2 involves a net increase of $21,640.  Change order #3 includes a net increase of $32,561.20.  (Change Order #1 was voided)  In addition, various bid items were adjusted during completion of the contract, with a net result being an increase of $26,304.93.

 

Project Details.  The following summarizes the details associated with the increased costs to the above referenced project.  Detailed information is attached.

 

Change Order #2:

1. Changes in project scope:

 

Change Order #3:

1.  Agreements with the adjacent property owners for the additional right-of-way and easements needed for utility relocates and to accommodate the improvements include, but are not limited to:

·         1847 Barker – remove and replace chain-link fence; construct retaining wall to replace raised flowerbed as part of the final grading.

  1. As part of the waterline project, the plans called for the removal of the existing 4’ wide sidewalk and replace with a 6’ wide sidewalk.  This greatly affected the grades to six of the existing driveways along E. 19th Street.  These driveways needed to be reconstructed and regarded. 
  2. Other miscellaneous changes include, but not limited to, adjustments to traffic control to address the concerns of the local residents, special water meter lids requested by the Water Department, joint sealant and dowels for the 9” concrete pavement, etc.

 

     Additional bid item quantities:

1.  The quantities for various bid items were exceeded from those provided in the bid documents for the following project sections:

 

Project Funding.   The source of funding for the project include general obligation bonds and cash financing from the Water and Sewer fund for the portion associated with the waterline work.  The original contract with RD Johnson for the project included $293,315.10 of bonded work and $184,378.00 for waterline work.  With the additional work encompassed by Change Orders #2 and #3 and bid item quantities, the original project amount needs to be increased by:

o  Change Order #2 (#21,640.00),

o  Change Order #3 ($32,561.20)

o  additional bid item quantities ($26,304.93)

 

Action Request.  Staff recommends City Commission approval of Change Order #2 and Change Order #3.  Additionally, staff is asking the City Commission to authorize the City Manager to increase the construction contract with RD Johnson in the total amount of $80,506.13.

 

att.

          Total Project Cost Breakdown, including engineering and ROW/Easement

              acquisitions

          Detailed Project Accounting (by bid item, including change order items)

          Description of additional work – Change Order #2

Description of additional work – Change Order #3