Memorandum
City of Lawrence
Public Works
TO: |
Mike Wildgen
|
FROM: |
Chuck Soules
|
CC: |
Dave Corliss, Debbie Van Saun, Terese Gorman
|
Date: |
February 8, 2005
|
RE: |
7th and Kentucky
|
Project Description: Reconstruction of the intersection at 7th and Kentucky including new signals, median, and new Post Office drop-off entering off Kentucky.
Project History:
April 22, 2003 – City Commission accepts funding for improvements from KDOT.
October 7, 2003 – City hires PEC for design of improvements.
December 15, 2004 – Bid letting.
January 4, 2005 – Approve Resolution 6576 authorizing the issuance of bonds.
Approve Authority to Award Contract/Commitment of City Funds.
Project Status: The project is bid; construction will begin later this spring.
Project Details: This is a 90/10 grant for construction and inspection, with a maximum State participation of $160,000. The City is responsible for 100% of the engineering, right-of-way, and utility costs in addition to the 10% share of construction costs.
COSTS TO DATE:
|
Total |
Participating |
Non-Participating |
Engineering |
$ 27,030.00 |
-0- |
$27,030.00 |
Project Bid |
$221,831.45 |
$160,000.00 |
$61,831.45 |
KDOT Construction/ Engineering |
$11,091.57 |
-0- |
11,091.57 |
LPA |
$ 45,483.95 |
-0- |
-0- |
TOTAL |
$305,436.97 |
$160,000.00 |
$99,953.02 |
The City will provide the LPA services (Local Public Authority Inspection) for this project ”in-house”. Since the construction costs have met the State’s maximum participation limit, the City will not receive any reimbursement for our costs ($45,483.95). This amount is reflective of the cost for inspection that the City is saving by providing this service with existing staff (versus contracting with an outside firm).
ACTION REQUESTED:
Authorize Mayor to sign agreement for LPA services for the improvements at 7th and Kentucky.
Respectfully submitted,
Charles F. Soules, P.E.
Director of Public Works