CITY OF LAWRENCE
Project No. 73-CP19-1102(BD)    
Folks Road, 6th to Harvard Road
Street, Storm Sewer and Waterline Improvements
Bid Date:  March 15, 2005
Bid Tab
Engineer's Estimate $925,366.00
M. L. Kelley Excavating R. D. Johnson LRM Industries
ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT
  SECTION 1 - STREET AND STORM - FOLKS ROAD                
1 Clearing and Grubbing L.S. 1  $      3,269.00  $       3,269.00  $         7,500.00  $         7,500.00  $       14,840.00  $     14,840.00
2 Unclassified Excavation C.Y. 2,080  $             3.65  $       7,592.00  $               4.00  $         8,320.00  $               8.50  $     17,680.00
3 Compaction of Earthwork C.Y. 216  $             2.50  $          540.00  $               5.00  $         1,080.00  $               7.50  $       1,620.00
4 Asphalt Surface Course (KDOT BM-2)* TON 541  $           36.00  $     19,476.00  $             36.00  $       19,476.00  $             39.00  $     21,099.00
5 Asphalt Base Course (KDOT BM-2B) (50% RAP)* TON 2,274  $           35.00  $     79,590.00  $             32.50  $       73,905.00  $             34.00  $     77,316.00
6 9" Class "C" Flyash Subgrade Stabilization (16%) S.Y. 5,741  $             3.10  $     17,797.10  $               3.25  $       18,658.25  $               3.50  $     20,093.50
7 8" Reinforced Concrete Pavement S.Y. 490  $           38.75  $     18,987.50  $             42.50  $       20,825.00  $             47.00  $     23,030.00
8 6" Concrete Driveway S.Y. 368  $           29.25  $     10,764.00  $             34.50  $       12,696.00  $             40.00  $     14,720.00
9 Gravel Drive S.Y. 57  $           14.50  $          826.50  $               8.75  $           498.75  $             10.00  $          570.00
10 Temporary Gravel Access Drive TON 160  $           11.25  $       1,800.00  $             12.00  $         1,920.00  $             25.00  $       4,000.00
11 Remove Gravel Pavement S.Y. 2,734  $             5.25  $     14,353.50  $               1.00  $         2,734.00  $               1.00  $       2,734.00
12 Remove Asphalt Pavement S.Y. 52  $             6.25  $          325.00  $               4.50  $           234.00  $             10.00  $          520.00
13 Remove Concrete Pavement S.Y. 144  $             6.75  $          972.00  $               8.00  $         1,152.00  $             10.00  $       1,440.00
14 Remove 5' Chain Link Fence
Replace with 6' Wood Privacy Fence
L.F. 142  $             3.00  $          426.00  $             18.00  $         2,556.00  $             32.00  $       4,544.00
15 Remove/Replace 6' Privacy Fence L.F. 21  $             9.75  $          204.75  $             15.00  $           315.00  $             32.00  $          672.00
16 Remove/Replace Sprinkler System L.S. 1  $         300.00  $          300.00  $           500.00  $           500.00  $           600.00  $          600.00
17 Type 1 Concrete Curb and Gutter L.F. 2,577  $           11.50  $     29,635.50  $             10.25  $       26,414.25  $             11.50  $     29,635.50
18 4" Concrete Sidewalk S.Y. 1,281  $           23.85  $     30,551.85  $             15.85  $       20,303.85  $             19.70  $     25,235.70
19 Integral Sidewalk and Retaining Wall L.F. 75  $           27.30  $       2,047.50  $             26.35  $         1,976.25  $             43.00  $       3,225.00
20 Speed Cushion - Typical EA 4  $                -    $                -    $           650.00  $         2,600.00  $           650.00  $       2,600.00
21 Speed Cushion - Center EA 4  $                -    $                -    $           615.00  $         2,460.00  $           600.00  $       2,400.00
22 Access Ramps EA 16  $         700.00  $     11,200.00  $           965.00  $       15,440.00  $         1,000.00  $     16,000.00
23 15" C.M.P. L.F. 42  $           21.50  $          903.00  $             23.25  $           976.50  $             30.00  $       1,260.00
24 18" C.M.P. L.F. 35  $           26.25  $          918.75  $             24.85  $           869.75  $             35.00  $       1,225.00
25 24" C.M.P. L.F. 28  $           30.50  $          854.00  $             30.55  $           855.40  $             40.00  $       1,120.00
26 30" C.M.P. L.F. 342  $           35.75  $     12,226.50  $             34.25  $       11,713.50  $             40.00  $     13,680.00
27 36" C.M.P. L.F. 598  $           47.85  $     28,614.30  $             38.75  $       23,172.50  $             46.00  $     27,508.00
28 6' x 4' Curb Inlet EA 2  $           23.10  $           46.20  $         2,380.00  $         4,760.00  $         3,000.00  $       6,000.00
29 6' x 5' Curb Inlet EA 2  $           24.30  $           48.60  $         2,725.00  $         5,450.00  $         3,400.00  $       6,800.00
30 5' x 5' Junction Box EA 6  $           34.75  $          208.50  $         2,600.00  $       15,600.00  $         3,200.00  $     19,200.00
31 24" Metal End Section EA 1  $      1,025.00  $       1,025.00  $           250.00  $           250.00  $           300.00  $          300.00
32 Flowable Fill C.Y. 1,364  $           52.00  $     70,928.00  $             45.00  $       61,380.00  $             42.00  $     57,288.00
33 Inlet Sediment Control Barrier EA 4  $         105.00  $          420.00  $           100.00  $           400.00  $             50.00  $          200.00
34 Silt Fence L.F. 710  $             2.00  $       1,420.00  $               1.50  $         1,065.00  $               1.75  $       1,242.50
35 Straw Bale Barrier Ditch Check EA 1  $         175.00  $          175.00  $             50.00  $             50.00  $           350.00  $          350.00
36 Bike Lane Pavement Marking EA 16  $         300.00  $       4,800.00  $           315.00  $         5,040.00  $           300.00  $       4,800.00
37 4" Solid Line, White** L.F. 2,194  $             2.50  $       5,485.00  $               2.60  $         5,704.40  $               2.60  $       5,704.40
38 6" Solid Line, White** L.F. 149  $             4.00  $          596.00  $               4.20  $           625.80  $               4.00  $          596.00
39 4" Dashed Line, Yellow** L.F. 1,005  $             3.00  $       3,015.00  $               3.15  $         3,165.75  $               3.00  $       3,015.00
40 6" Dashed Line, White** L.F. 54  $             4.00  $          216.00  $               4.20  $           226.80  $               4.00  $          216.00
41 2' Solid Stop Bar, White** L.F. 28  $           20.00  $          560.00  $             21.00  $           588.00  $             21.00  $          588.00
42 36" x 6' Solid Crosswalk, White** L.F. 52  $           32.00  $       1,664.00  $             31.50  $         1,638.00  $             31.00  $       1,612.00
43 4" Double Line, Yellow** L.F. 222  $             6.00  $       1,332.00  $               6.30  $         1,398.60  $               6.50  $       1,443.00
44 Left Turn Arrow** EA 3  $             2.25  $             6.75  $           235.00  $           705.00  $           230.00  $          690.00
45 3 Gallon Kallay Juniper EA 8  $         175.00  $       1,400.00  $             42.00  $           336.00  $             42.00  $          336.00
46 3 Gallon Mentor Barberry EA 28  $         145.00  $       4,060.00  $             42.00  $         1,176.00  $             42.00  $       1,176.00
47 Pine Bark Mulch (4" Depth) C.Y. 9  $         100.00  $          900.00  $             60.00  $           540.00  $             85.00  $          765.00
48 Traffic Control L.S. 1  $      1,000.00  $       1,000.00  $         8,300.00  $         8,300.00  $       10,425.00  $     10,425.00
49 Traffic Signal Improvements L.S. 1  $         431.25  $          431.25  $       34,200.00  $       34,200.00  $       33,250.00  $     33,250.00
50 Construction Staking L.S. 1  $           62.10  $           62.10  $         4,670.00  $         4,670.00  $         4,600.00  $       4,600.00
51 Seed, Fertilize, and Mulch L.S. 1  $      2,700.00  $       2,700.00  $         2,250.00  $         2,250.00  $         1,900.00  $       1,900.00
  Total Section 1        $   396,674.15    $     438,671.35    $   491,864.60
                   
  SECTION 2 - STREET - OLD OAK COURT                
1 Clearing and Grubbing L.S. 1  $         579.00  $          579.00  $           400.00  $           400.00  $           250.00  $          250.00
2 Unclassified Excavation C.Y. 54  $             3.65  $          197.10  $             20.00  $         1,080.00  $             21.00  $       1,134.00
3 Compaction of Earthwork C.Y. 3,217  $             2.50  $       8,042.50  $               4.00  $       12,868.00  $               1.20  $       3,860.40
4 Asphalt Surface Course (KDOT BM-2)* TON 109  $           36.00  $       3,924.00  $             36.00  $         3,924.00  $             39.00  $       4,251.00
5 Asphalt Base Course (KDOT BM-2B)* TON 354  $           35.00  $     12,390.00  $             32.50  $       11,505.00  $             34.00  $     12,036.00
6 9" Class "C" Flyash Subgrade Preparation S.Y. 1,058  $             3.10  $       3,279.80  $               3.25  $         3,438.50  $               3.50  $       3,703.00
7 Type 1 Concrete Curb and Gutter L.F. 545  $           11.50  $       6,267.50  $               9.60  $         5,232.00  $             11.50  $       6,267.50
8 5' x 4" Concrete Sidewalk L.F. 173  $           14.00  $       2,422.00  $               9.75  $         1,686.75  $             12.00  $       2,076.00
9 Access Ramp EA 1  $         700.00  $          700.00  $           980.00  $           980.00  $         1,000.00  $       1,000.00
  Total Section 2        $     37,801.90    $       41,114.25    $     34,577.90
                   
  SECTION 3 - STREET - LARISSA DRIVE                
1 Clearing and Grubbing L.S. 1  $         689.00  $          689.00  $           300.00  $           300.00  $           250.00  $          250.00
2 Unclassified Excavation C.Y. 187  $             3.65  $          682.55  $             10.00  $         1,870.00  $               8.50  $       1,589.50
3 Compaction of Earthwork C.Y. 65  $             2.50  $          162.50  $             15.00  $           975.00  $               7.50  $          487.50
4 Asphalt Surface Course (KDOT BM-2)* TON 33  $           36.00  $       1,188.00  $             36.00  $         1,188.00  $             39.00  $       1,287.00
5 Asphalt Base Course (KDOT BM-2B)* TON 108  $           35.00  $       3,780.00  $             32.50  $         3,510.00  $             34.00  $       3,672.00
6 9" Class "C" Flyash Subgrade Preparation S.Y. 330  $             3.10  $       1,023.00  $               3.25  $         1,072.50  $               3.50  $       1,155.00
7 Type "1" Concrete Curb and Gutter L.F. 212  $           11.50  $       2,438.00  $               9.60  $         2,035.20  $             11.50  $       2,438.00
8 5' x 4" Concrete Sidewalk L.F. 220  $           14.00  $       3,080.00  $               9.75  $         2,145.00  $             12.00  $       2,640.00
  Total Section 3        $     13,043.05    $       13,095.70    $     13,519.00
                   
  SECTION 4 - WATERLINE - FOLKS ROAD                
1 12" D.I.P. Waterline L.F. 1,354  $           55.50  $     75,147.00  $             49.35  $       66,819.90  $             48.00  $     64,992.00
2 12" x 12" x 8" MJ Tee EA 2  $             5.25  $           10.50  $           285.00  $           570.00  $           275.00  $          550.00
3 12" x 12" x 6" MJ Tee EA 3  $             4.60  $           13.80  $           285.00  $           855.00  $           275.00  $          825.00
4 12" MH Gate Valve, Box and Cover EA 5  $           12.75  $           63.75  $         1,160.00  $         5,800.00  $         1,130.00  $       5,650.00
5 Standard Fire Hydrant Assembly EA 3  $           18.50  $           55.50  $         1,855.00  $         5,565.00  $         1,800.00  $       5,400.00
6 Connect to Existing Waterline EA 2  $             5.25  $           10.50  $           535.00  $         1,070.00  $           520.00  $       1,040.00
7 Flowable Fill C.Y. 95  $           50.00  $       4,750.00  $             60.00  $         5,700.00  $             58.00  $       5,510.00
8 12" x 90° Bend and Block EA 2  $             6.05  $           12.10  $           240.00  $           480.00  $           230.00  $          460.00
9 12" x 11.25° Bend and Block EA 1  $             3.75  $             3.75  $           215.00  $           215.00  $           210.00  $          210.00
10 Reconnect Existing Service Line EA 4  $             4.25  $           17.00  $           750.00  $         3,000.00  $           730.00  $       2,920.00
  Total Section 4        $     80,083.90    $       90,074.90    $     87,557.00
                   
  SECTION 5 - WATERLINE - OLD OAK COURT                
1 8" PVC Waterline L.F. 239  $           23.00  $       5,497.00  $             33.60  $         8,030.40  $             33.00  $       7,887.00
2 8" MJ Gate Valve, Box and Cover EA 1  $             6.20  $             6.20  $           665.00  $           665.00  $           650.00  $          650.00
3 8" MJ Plug EA 1  $         200.00  $          200.00  $           225.00  $           225.00  $           220.00  $          220.00
4 Standard Fire Hydrant Assembly EA 1  $           18.50  $           18.50  $         1,855.00  $         1,855.00  $         1,800.00  $       1,800.00
5 Flowable Fill C.Y. 1  $           50.00  $           50.00  $             60.00  $             60.00  $             58.00  $           58.00
  Total Section 5        $       5,771.70    $       10,835.40    $     10,615.00
                   
  SECTION 6 - WATERLINE - LARISSA DRIVE                
1 8" PVC Waterline L.F. 113  $           23.00  $       2,599.00  $             33.60  $         3,796.80  $             33.00  $       3,729.00
2 8" MJ Gate Valve, Box and Cover EA 1  $             6.20  $             6.20  $           665.00  $           665.00  $           650.00  $          650.00
3 2" Blow-Off Assembly EA 1  $             3.90  $             3.90  $           425.00  $           425.00  $           425.00  $          425.00
4 8" x 2" Drilled Plug EA 1  $           85.00  $           85.00  $           180.00  $           180.00  $           175.00  $          175.00
5 Flowable Fill C.Y. 6  $           50.00  $          300.00  $             60.00  $           360.00  $             58.00  $          348.00
  Total Section 6        $       2,994.10    $         5,426.80    $       5,327.00
                   
  GRAND TOTAL OF ALL SECTIONS        $   536,368.80    $     599,218.40    $   643,460.50