CITY OF LAWRENCE
Project No. 28-CP8-604(BD)
Lake Pointe Drive, 22nd Terrace to Clinton Parkway
Street, Storm Sewer, Roundabout Improvements
Bid Date:  March 18, 2005
Bid Tab
Engineer's Estimate:  $859,071.05
LRM Industries, Inc. D. F. Freeman Linaweaver Construction, Inc.
ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT
  LAKE POINTE DRIVE IMPROVEMENTS - SECTION 1                $                   -  
1 Clearing and Grubbing L.S. 1  $         960.00  $         960.00  $       5,000.00  $      5,000.00  $     20,000.00  $      20,000.00
2 Removal of Existing Structures L.S. 1  $             1.00  $             1.00  $     12,650.00  $    12,650.00  $       5,000.00  $        5,000.00
3 Unclassified Excavation C.Y. 2566  $             3.10  $      7,954.60  $              9.25  $    23,735.50  $              9.00  $      23,094.00
4 Type B Compaction (MR 90) C.Y. 542  $             2.90  $      1,571.80  $              5.00  $      2,710.00  $              4.00  $        2,168.00
5 9" Fly Ash Stabilization S.Y. 5430  $             3.40  $    18,462.00  $              3.22  $    17,484.60  $              4.50  $      24,435.00
6 Asphalt Surfacing (Surface Course) (BM-2) Ton 555.2  $           39.00  $    21,652.80  $            39.96  $    22,185.79  $            52.45  $      29,120.24
7 Asphalt Surfacing (Base Course) (BM-2B) (50% Recycle) Ton 2446.5  $           34.00  $    83,181.00  $            32.94  $    80,587.71  $            40.62  $      99,376.83
8 6" Concrete Entrance (Reinforced) (A.E.) S.Y. 160.6  $           36.00  $      5,781.60  $            58.25  $      9,354.95  $            38.00  $        6,102.80
9 Concrete Curb and Gutter (A.E.) L.F. 2449.4  $           12.00  $    29,392.80  $            10.30  $    25,228.82  $              9.35  $      22,901.89
10 6" Asphalt Curb L.F. 334.7  $             5.00  $      1,673.50  $            10.80  $      3,614.76  $            13.50  $        4,518.45
11 Concrete Sidewalk (4") (A.E.) S.Y. 1330.5  $           19.00  $    25,279.50  $            21.65  $    28,805.33  $            31.00  $      41,245.50
12 5' Access Ramp Each 2  $      1,000.00  $      2,000.00  $       1,350.00  $      2,700.00  $       1,100.00  $        2,200.00
13 5' x 4' Standard Curb Inlet (Precast) Each 1  $      2,900.00  $      2,900.00  $       2,916.00  $      2,916.00  $       2,500.00  $        2,500.00
14 5' x 5' Standard Curb Inlet (Precast) Each 1  $      3,230.00  $      3,230.00  $       3,240.00  $      3,240.00  $       2,800.00  $        2,800.00
15 6' x 4' Standard Curb Inlet (Precast) Each 2  $      3,230.00  $      6,460.00  $       3,240.00  $      6,480.00  $       2,700.00  $        5,400.00
16 8' x 4' Standard Curb Inlet (Precast) Each 1  $      3,550.00  $      3,550.00  $       3,564.00  $      3,564.00  $       3,200.00  $        3,200.00
17 5' x 5' Junction Box (Precast) Each 1  $      3,550.00  $      3,550.00  $       3,564.00  $      3,564.00  $       3,300.00  $        3,300.00
18 18" Storm Sewer (CMP) L.F. 342  $           52.00  $    17,784.00  $            51.84  $    17,729.28  $            55.00  $      18,810.00
19 30" Storm Sewer (CMP) L.F. 390  $           66.00  $    25,740.00  $            65.88  $    25,693.20  $            70.00  $      27,300.00
20 36" Storm Sewer (CMP) L.F. 20  $           94.00  $      1,880.00  $            93.96  $      1,879.20  $            86.00  $        1,720.00
21 Flowable Fill L.F. 476  $           56.00  $    26,656.00  $            60.48  $    28,788.48  $            80.00  $      38,080.00
22 Traffic Sign (Installed) Each 1  $         650.00  $         650.00  $          648.00  $         648.00  $          660.00  $           660.00
23 Silt Fence L.F. 1565  $             1.50  $      2,347.50  $              2.75  $      4,303.75  $              2.00  $        3,130.00
24 Temporary Curb Inlet Sediment Barrier Each 5  $         100.00  $         500.00  $          110.00  $         550.00  $          150.00  $           750.00
25 Temporary Seeding L.S. 1  $         880.00  $         880.00  $       2,700.00  $      2,700.00  $       4,000.00  $        4,000.00
26 Construction Staking L.S. 1  $      2,700.00  $      2,700.00  $       5,551.20  $      5,551.20  $       3,550.00  $        3,550.00
27 Seeding, Fertilizing and Mulching L.S. 1  $      1,400.00  $      1,400.00  $       2,700.00  $      2,700.00  $       6,000.00  $        6,000.00
28 Mobilization L.S. 1  $      8,040.00  $      8,040.00  $     19,260.01  $    19,260.01  $     20,000.00  $      20,000.00
   TOTAL SECTION 1         $  306,178.10    $  363,624.58    $    421,362.71
  CLINTON PARKWAY AND LAKE POINTE DRIVE - INTERSECTION IMPROVEMENTS -  SECTION 2          
1 Clearing and Grubbing L.S. 1  $         960.00  $         960.00  $       5,000.00  $      5,000.00  $       4,000.00  $        4,000.00
2 Removal of Existing Structures L.S. 1  $    25,900.00  $    25,900.00  $     35,000.00  $    35,000.00  $     30,000.00  $      30,000.00
3 Unclassified Excavation C.Y. 2095  $             3.10  $      6,494.50  $              7.50  $    15,712.50  $            15.00  $      31,425.00
4 Type B Compaction (MR 90) C.Y. 877  $             2.90  $      2,543.30  $              5.00  $      4,385.00  $              4.00  $        3,508.00
5 6" AB-3 Base S.Y. 367  $             5.00  $      1,835.00  $              6.90  $      2,532.30  $              5.00  $        1,835.00
6 9" Fly Ash Stabilization S.Y. 3723.5  $             3.40  $    12,659.90  $              3.15  $    11,729.03  $              4.50  $      16,755.75
7 10" Concrete Pavement (NRDJ) (A.E.) S.Y. 2777  $           59.10  $  164,120.70  $            63.25  $  175,645.25  $            60.00  $    166,620.00
8 8" Exposed Aggregate Concrete (Reinforced) (A.E.) S.Y. 287  $           67.30  $    19,315.10  $            81.40  $    23,361.80  $            76.45  $      21,941.15
9 6" Exposed Aggregate Concrete (A.E.) S.Y. 80.3  $           63.00  $      5,058.90  $            72.60  $      5,829.78  $            68.00  $        5,460.40
10 Concrete Curb and Gutter (A.E.) L.F. 2783.3  $           15.00  $    41,749.50  $            18.68  $    51,992.04  $            17.00  $      47,316.10
11 8" Concrete Protection Curb (A.E.) L.F. 183.8  $           17.00  $      3,124.60  $            27.15  $      4,990.17  $            33.00  $        6,065.40
12 10' Fiber Reinforced Concrete Recreational Path (6")(A.E.) S.Y. 552.9  $           59.00  $    32,621.10  $            43.55  $    24,078.80  $            34.00  $      18,798.60
13 5' Concrete Sidewalk (4")(A.E.) S.Y. 72.2  $           18.00  $      1,299.60  $            21.63  $      1,561.69  $            31.00  $        2,238.20
14 10' Access Ramp Each 6  $      1,350.00  $      8,100.00  $       1,525.00  $      9,150.00  $       1,100.00  $        6,600.00
15 Median Ramp Crossing Each 3  $      1,610.00  $      4,830.00  $       2,025.00  $      6,075.00  $       2,750.00  $        8,250.00
16 5' x 4' Standard Curb Inlet (Precast) Each 2  $      2,380.00  $      4,760.00  $       3,240.00  $      6,480.00  $       2,500.00  $        5,000.00
17 12" Storm Sewer (RCP) L.F. 249  $           34.00  $      8,466.00  $            54.00  $    13,446.00  $            38.00  $        9,462.00
18 12" End Section (RC) Each 1  $         400.00  $         400.00  $          432.00  $         432.00  $          400.00  $           400.00
19 Flowable Fill for Storm Sewer L.F. 195  $           15.00  $      2,925.00  $            43.20  $      8,424.00  $            25.00  $        4,875.00
20 Keystone Compaq Retaining Wall L.F. 126  $           52.20  $      6,577.20  $            52.35  $      6,596.10  $            60.00  $        7,560.00
21 3" PVC Conduit for Water Service L.F. 88.0  $           11.00  $         968.00  $            50.00  $      4,400.00  $            20.00  $        1,760.00
22 Permanent Signing L.S. 1  $      4,750.00  $      4,750.00  $       4,762.80  $      4,762.80  $       4,850.00  $        4,850.00
23 Pavement Markings L.S. 1  $      5,600.00  $      5,600.00  $       5,612.23  $      5,612.23  $       5,725.00  $        5,725.00
24 Silt Fence L.F. 416  $             1.50  $         624.00  $              2.75  $      1,144.00  $              2.00  $           832.00
25 Temporary Curb Inlet Sediment Barrier Each 2  $         100.00  $         200.00  $          109.01  $         218.02  $          150.00  $           300.00
26 Temporary Seeding L.S. 1  $         880.00  $         880.00  $       2,700.00  $      2,700.00  $       1,500.00  $        1,500.00
27 Lighting L.S. 1  $    32,125.00  $    32,125.00  $     32,238.00  $    32,238.00  $     35,000.00  $      35,000.00
28 Traffic Control L.S. 1  $      8,700.00  $      8,700.00  $       8,731.80  $      8,731.80  $       9,000.00  $        9,000.00
29 Construction Staking L.S. 1  $      4,590.00  $      4,590.00  $       6,037.20  $      6,037.20  $       8,600.00  $        8,600.00
30 Seeding, Fertilizing and Mulching L.S. 1  $      1,450.00  $      1,450.00  $       2,700.00  $      2,700.00  $       3,000.00  $        3,000.00
31 Mobilization L.S. 1  $      8,040.00  $      8,040.00  $     17,100.01  $    17,100.01  $     20,000.00  $      20,000.00
   TOTAL SECTION 2         $  421,667.40    $  498,065.52    $    488,677.60
  LAKE VIEW ADDITION STORM SEWER - SECTION 3          
1 Clearing and Grubbing L.S. 1  $      1,100.00  $      1,100.00  $       2,580.00  $      2,580.00 8000  $        8,000.00
2 36" CMP L.F. 374  $           94.00  $    35,156.00  $            93.96  $    35,141.04 91  $      34,034.00
3 42" CMP L.F. 175  $         102.00  $    17,850.00  $          102.60  $    17,955.00 115  $      20,125.00
4 48" CMP L.F. 55  $         107.00  $      5,885.00  $          106.92  $      5,880.60 127  $        6,985.00
5 48" Metal End Section Each 1  $      1,290.00  $      1,290.00  $       1,296.00  $      1,296.00 1000  $        1,000.00
6 6' x 4' Curb Inlet Each 1  $      3,330.00  $      3,330.00  $       3,348.00  $      3,348.00 2800  $        2,800.00
7 6' x 6' Curb Inlet Each 1  $      3,330.00  $      3,330.00  $       3,348.00  $      3,348.00 3600  $        3,600.00
8 6' x 4' Junction Box Each 1  $      3,010.00  $      3,010.00  $       3,024.00  $      3,024.00 6600  $        6,600.00
9 6' x 6' Junction Box Each 1  $      3,440.00  $      3,440.00  $       3,456.00  $      3,456.00 5200  $        5,200.00
10 5' x 5' Junction Box  Each 2  $      3,010.00  $      6,020.00  $       3,024.00  $      6,048.00 3500  $        7,000.00
11 18" Nominal Diameter Rip-Rap S.Y. 44  $           32.00  $      1,408.00  $            58.32  $      2,566.08 60  $        2,640.00
12 Unclassified Excavation C.Y. 4389  $             1.00  $      4,389.00  $              1.15  $      5,047.35 15  $      65,835.00
13 Compaction of Earthwork C.Y. 1713  $             0.50  $         856.50  $              1.15  $      1,969.95 2  $        3,426.00
14 Seeding, Fertilizing and Mulching L.S. 1  $      2,830.00  $      2,830.00  $       3,780.00  $      3,780.00 5000  $        5,000.00
   TOTAL SECTION 3         $    89,894.50    $    95,440.02    $    172,245.00
                   
  GRAND TOTAL OF SECTIONS 1, 2 AND 3        $  817,740.00    $  957,130.12    $ 1,082,285.31