PROJECT LOCATION |
SPEED |
VOLUME |
CRASHES |
SIDEWALKS |
SCHOOL CROSSING |
PEDESTRIAN GENERATORS |
TOTAL POINTS |
Measure |
Pts |
Measure |
Pts |
Measure |
Pts |
Measure |
Pts |
Measure |
Pts |
Measure |
Pts |
University
Place |
30.3 |
27 |
2367 |
24 |
28-P 4-I |
36 |
1-side |
5 |
|
0 |
park, school |
10 |
102 |
21-Jun-04 |
|
|
|
|
|
|
|
|
|
|
|
|
|
9th & Schwarz |
38.6 |
43 |
6140 |
20 |
3-P 1-I |
5 |
2-sides |
0 |
adult guard |
0 |
school |
5 |
73 |
8-Mar-05 |
|
|
|
|
|
|
|
|
|
|
|
|
|
Massachusetts Street |
35.5 |
28 |
2700 |
27 |
2-I |
4 |
1-side |
5 |
|
0 |
school |
5 |
69 |
11-May-04 |
|
|
|
|
|
|
|
|
|
|
|
|
|
West Lawrence |
37.3 |
37 |
1856 |
6 |
6-P 2-I |
10 |
2-sides |
0 |
|
0 |
|
0 |
53 |
15-Feb-05 |
|
|
|
|
|
|
|
|
|
|
|
|
|
Carmel Drive |
36.1 |
31 |
855 |
8 |
1-P |
1 |
1-side |
5 |
|
0 |
|
0 |
45 |
31-Aug-04 |
|
|
|
|
|
|
|
|
|
|
|
|
|
Bobwhite Drive |
35.1 |
26 |
1000 |
3 |
0 |
0 |
1-side |
5 |
|
0 |
|
0 |
34 |
8-Mar-05 |
|
|
|
|
|
|
|
|
|
|
|
|
|
Winona Avenue |
35.2 |
26 |
246 |
2 |
0 |
0 |
2-sides |
0 |
|
0 |
school |
5 |
33 |
21-Jun-04 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
SPEED: 5 points will be assigned for each mile per
hour that the 85th percentile speed exceeds the lawful speed limit |
|
|
VOLUME:
1 point will be assigned for every 100 vehicles per day on local
streets; 1 point will be assigned for every 300 vehicles per day on collector
streets |
CRASHES:
1 point will be assigned for each reported property damage crash along
the project corridor during the previous 3 years; 2 points for injury; 5
points for fatal |
SIDEWALKS: 5 point will be assigned for there is not a
continuous sidewalk along both sides of the project corridor; 10 points if
not on either side |
|
SCHOOLS: 10 points will be assigned for each
unprotected official school crosswalk that crosses the project corridor |
|
|
PEDESTRIAN GENERATORS: 5 points will be assigned for each
pedestrian generator such as a park, school or recreation center adjacent to
the project corridor |
|
|
|
|
|
|
|
|
|
|
|
|
|
|