City of Lawrence
Project 01-SR1-105(S)
6th Street, Missouri Street to Massachusetts Street
Milling, Overlay, Pavement Marking (KLINK)
BID TAB
Engineer's Estimate:  $482,926.30
Bid Date:  April 26, 2005
LRM Industries, Inc. R. D. Johnson Excavating, Co.
Item Description Quantity Unit Unit Price Amount Unit Price Amount
1 Milling 2" Depth (P) 27,654 S.Y.  $           1.35  $   37,332.90  $            1.50  $    41,481.00
2 Milling 2" Depth (NP) 1,005 S.Y.  $           1.35  $    1,356.75  $            1.50  $      1,507.50
3 Asphaltic Concrete (BM-2, Special) 2" Overlay (P)* 3,195 TON  $         36.30  $ 115,978.50  $          38.00  $   121,410.00
4 Asphaltic Concrete (BM-2, Special) 2" Overlay (NP)* 140 TON  $         54.00  $    7,560.00  $          38.00  $      5,320.00
5 Concrete Pavement Patch (Full Depth) (P)*** 250 S.Y.  $       110.00  $   27,500.00  $        110.00  $    27,500.00
6 Asphalt Pavement Patch (Full Depth) (P)*** 100 TON  $       105.00  $   10,500.00  $        100.00  $    10,000.00
7 Crackfilling (P)*** 100 L.F.  $           2.00  $       200.00  $            3.00  $         300.00
8 Demolition (See Sheet 13 and General Notes) (P) 1 L.S.  $    6,400.00  $    6,400.00  $    39,800.00  $    39,800.00
9 10" High Early Durable Portland Cement Concrete (P) 692 S.Y.  $         80.00  $   55,360.00  $          87.00  $    60,204.00
10 Modified 24" Concrete Curb and Gutter (P) 260 L.F.  $         23.25  $    6,045.00  $          34.50  $      8,970.00
11 Remove & Replace Modified 30" Curb & Gutter (NP) 520 L.F.  $         29.50  $   15,340.00  $          39.00  $    20,280.00
12 Remove & Replace 24" Curb & Gutter (NP) 2,045 L.F.  $         21.00  $   42,945.00  $          28.00  $    57,260.00
13 4" Concrete Sidewalk (See Spec Book for Standard Details) (NP) 20 S.Y.  $         55.00  $    1,100.00  $          30.80  $         616.00
14 6' Concrete Access Ramp (NP) 15 EACH  $    1,180.00  $   17,700.00  $     1,150.00  $    17,250.00
15 Standard 8' x 4' Storm Sewer Curb Inlet (NP) 2 EACH  $    3,800.00  $    7,600.00  $     4,000.00  $      8,000.00
16 Standard 6' x 4' Storm Sewer Curb Inlet (NP) 1 EACH  $    3,300.00  $    3,300.00  $     3,600.00  $      3,600.00
17 Standard 5' X 4' Storm Sewer Curb Inlet (NP) 2 EACH  $    3,100.00  $    6,200.00  $     3,400.00  $      6,800.00
18 Seed, Fertilize and Mulch (NP) 1 L.S.  $    2,600.00  $    2,600.00  $     4,000.00  $      4,000.00
19 Traffic Control (P) 1 L.S.  $   15,165.00  $   15,165.00  $    10,000.00  $    10,000.00
20 6" Broken White Lane Line (Class A) (P) (Applied to Asphalt) 1,400 L.F.  $           3.05  $    4,270.00  $            3.30  $      4,620.00
21 6" Broken White Lane Line (Class A) (P) (Applied to Concrete)**** 70 L.F.  $           2.10  $       147.00  $            2.30  $         161.00
22 6" Dotted White Lane Line (Class A) (P) 122 L.F.  $           3.05  $       372.10  $            3.30  $         402.60
23 6" Dotted White Extension Line (Class A) (P) 154 L.F.  $           3.05  $       469.70  $            3.30  $         508.20
24 6" Solid White Channelization Line (Class A) (P) 2,379 L.F.  $           3.05  $    7,255.95  $            3.30  $      7,850.70
25 6" Solid White Edge Line (Class A) (P) 94 L.F.  $           3.00  $       282.00  $            3.30  $         310.20
26 12" Solid White Diagonal Line (Class A) (P) 172 L.F.  $           5.00  $       860.00  $            6.70  $      1,152.40
27 24" Solid White Stop Line (Class A) (P) (Applied to Asphalt) 427 L.F.  $           7.40  $    3,159.80  $            7.80  $      3,330.60
28 24" Solid White Stop Line (Class A) (P) (Applied to Concrete)**** 27 L.F.  $         10.20  $       275.40  $          11.00  $         297.00
29 36" Solid White Crosswalk Line (Class A) (P) 444 L.F.  $         11.00  $    4,884.00  $          11.50  $      5,106.00
30 4" Broken Yellow Lane Line (Class B) (P) 960 L.F.  $           2.05  $    1,968.00  $            2.20  $      2,112.00
31 4" Solid Yellow Lane Line (Class B) (P) (Applied to Asphalt) 3,894 L.F.  $           2.05  $    7,982.70  $            2.20  $      8,566.80
32 4" Solid Yellow Lane Line (Class B) (P) (Applied to Concrete) 259 L.F.  $           2.05  $       530.95  $            2.20  $         569.80
33 4" Solid Double Yellow Lane Line (Class B) (P)** 671 L.F.  $           4.10  $    2,751.10  $            4.40  $      2,952.40
34 12" Solid Yellow Diagonal Line (Class B) (P) 153 L.F.  $           6.30  $       963.90  $            6.70  $      1,025.10
35 Left Turn Lane -- Use Arrow (P) 31 EACH  $       170.00  $    5,270.00  $        165.00  $      5,115.00
36 Right Turn Lane -- Use Arrow (P) 2 EACH  $       170.00  $       340.00  $        165.00  $         330.00
37 Through Lane -- Use Arrow (P) (Applied to Asphalt) 4 EACH  $       185.00  $       740.00  $        200.00  $         800.00
38 Through Lane -- Use Arrow (P) (Applied to Concrete)**** 2 EACH  $       185.00  $       370.00  $        200.00  $         400.00
39 Sanitary Sewer Manhole Adjustment (NP)***** 1 EACH  $       700.00  $       700.00  $        750.00  $         750.00
40 Storm Sewer Manhole Adjustment (NP)***** 2 EACH  $       700.00  $    1,400.00  $        750.00  $      1,500.00
41 Water Valve Box Adjustment (NP)***** 12 EACH  $       185.00  $    2,220.00  $        250.00  $      3,000.00
42 Water Meter Box Adjustment (NP)***** 1 EACH  $       185.00  $       185.00  $        300.00  $         300.00
43 Loop Detector Installation (P)***** 608 L.F.  $           9.70  $    5,897.60  $          12.00  $      7,296.00
  GRAND TOTAL        $ 433,478.35    $   502,754.30