|
CITY OF LAWRENCE |
|
|
|
|
|
|
|
|
|
Project
9-SR2-205(C) |
|
|
2005 Overlay Program, Phase 1 |
|
|
BID TAB |
|
|
Engineer's Estimate: $865,156.50 |
|
|
Bid Date: May 10, 2005 |
|
|
|
|
LRM
Industries, Inc. |
Asphalt Improvement Co. |
|
ITEM |
DESCRIPTION |
UNIT |
QUANTITY |
UNIT PRICE |
AMOUNT |
UNIT PRICE |
AMOUNT |
|
1 |
Asphaltic Concrete (BM-2)
2" Overlay |
TONS |
8,989 |
$
33.95 |
$ 305,176.55 |
$
35.75 |
$ 321,356.75 |
|
|
2 |
Asphaltic
Concrete (BM-2 Special) 2" Overlay |
TONS |
3,663 |
$
35.50 |
$ 130,036.50 |
$
36.00 |
$ 131,868.00 |
|
|
3 |
Milling (2") |
S.Y. |
105,338 |
$
1.06 |
$ 111,658.28 |
$
1.31 |
$ 137,992.78 |
|
|
4 |
Asphaltic
Concrete Pavement Patching
(BM-2) (full depth)* |
TONS |
99 |
$
110.00 |
$ 10,890.00 |
$
100.00 |
$ 9,900.00 |
|
|
5 |
Concrete Pavement Patch (full
depth)* |
S.Y. |
975 |
$
73.50 |
$ 71,662.50 |
$
110.00 |
$ 107,250.00 |
|
|
6 |
Driveways
(asphalt wedges)* |
S.Y. |
575 |
$
10.15 |
$ 5,836.25 |
$
8.00 |
$ 4,600.00 |
|
|
7 |
Crackfilling
* |
L.F. |
6,459 |
$
0.65 |
$ 4,198.35 |
$
1.00 |
$ 6,459.00 |
|
|
8 |
Joint
Membrane * |
L.F. |
20,352 |
$
1.55 |
$
31,545.60 |
$
1.85 |
$
37,651.20 |
|
|
9 |
Manhole
Adjustment |
EACH |
4 |
$
690.00 |
$ 2,760.00 |
$
700.00 |
$ 2,800.00 |
|
|
10 |
Valve
Adjustment |
EACH |
12 |
$
180.00 |
$ 2,160.00 |
$
200.00 |
$ 2,400.00 |
|
|
11 |
Traffic
Signal Loops |
L.F. |
820 |
$
9.60 |
$ 7,872.00 |
$
9.70 |
$ 7,954.00 |
|
|
12 |
Cold
Plastic Reflectorized Pavement Marking |
|
|
|
$ - |
|
$ - |
|
|
|
a) 4" Yellow |
L.F. |
2,014 |
$
2.00 |
$ 4,028.00 |
$
2.05 |
$ 4,128.70 |
|
|
|
b) 6" Yellow |
L.F. |
120 |
$
3.55 |
$ 426.00 |
$
3.60 |
$ 432.00 |
|
|
|
c) 12" Yellow |
L.F. |
25 |
$
6.55 |
$ 163.75 |
$
6.75 |
$ 168.75 |
|
|
|
d) 6" White |
L.F. |
2,078 |
$
3.00 |
$ 6,234.00 |
$
3.05 |
$ 6,337.90 |
|
|
|
e) 24" Stop Bar |
L.F. |
329 |
$
7.60 |
$ 2,500.40 |
$
7.50 |
$ 2,467.50 |
|
|
|
f) 3' X 6' Crosswalk |
L.F. |
398 |
$
10.60 |
$ 4,218.80 |
$
11.00 |
$ 4,378.00 |
|
|
|
g) 3' X 10' Crosswalk |
L.F. |
108 |
$
17.70 |
$ 1,911.60 |
$
17.60 |
$ 1,900.80 |
|
|
|
h) Turn Arrows |
EACH |
20 |
$
195.00 |
$ 3,900.00 |
$
200.00 |
$ 4,000.00 |
|
|
13 |
Traffic
Control |
L.S. |
1 |
$
32,725.00 |
$ 32,725.00 |
$
11,800.00 |
$ 11,800.00 |
|
|
|
|
Grand Total |
|
$ 739,903.58 |
|
$ 805,845.38 |
|
|
*Estimated Quantities |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|