CITY OF LAWRENCE
Project No. 20-SR4-405(C)                                     
2005 Overlay Program,  Phase 2
BID TAB
Engineer's Estimate:  $827,537.20 
Bid Date:  May 24, 2005
LRM Industries, Inc. Kansas Heavy Construction, LLC D. F. Freeman Contractor's Inc.
ITEM DESCRIPTION UNITS QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT
1 Asphaltic Concrete (BM-2) 2" Overlay  TONS 1,353  $         34.85  $   47,152.05  $         35.00  $            47,355.00  $         50.00  $      67,650.00
2 Asphaltic Concrete (BM-2 Special) 2" Overlay  TONS 1,599  $         36.25  $   57,963.75  $         35.25  $            56,364.75  $           5.00  $        7,995.00
3 Milling    S.Y. 25,082  $           1.30  $   32,606.60  $           1.74  $            43,642.68  $           1.80  $      45,147.60
4 24" Concrete Curb & Gutter (9") L.F. 18,214  $         19.65  $ 357,905.10  $         19.60  $         356,994.40  $         21.20  $    386,136.80
5 6" Concrete Pavement (reinforced) S.Y. 1,571  $         49.25  $   77,371.75  $         59.00  $            92,689.00  $         67.30  $    105,728.30
6 4" Concrete Sidewalk S.Y. 60  $         36.70  $      2,202.00  $         55.00  $              3,300.00  $         79.30  $        4,758.00
7 6" Concrete Access Ramp EACH 15  $    1,000.00  $   15,000.00  $    1,750.00  $            26,250.00  $    1,485.00  $      22,275.00
8 6'X 4' Std. Curb Inlet EACH 7  $    3,300.00  $   23,100.00  $    4,075.00  $            28,525.00  $    4,301.00  $      30,107.00
9 8'X 4' Std. Curb Inlet EACH 4  $    4,100.00  $   16,400.00  $    4,350.00  $            17,400.00  $    4,540.00  $      18,160.00
10 6' X 5' Std. Curb Inlet EACH 2  $    3,750.00  $      7,500.00  $    4,200.00  $              8,400.00  $    4,420.00  $        8,840.00
11 Crackfilling * L.F. 2,937  $           0.65  $      1,909.05  $           1.00  $              2,937.00  $           2.50  $        7,342.50
12 Joint Membrane * L.F. 19,880  $           1.55  $   30,814.00  $           2.25  $            44,730.00  $           2.50  $      49,700.00
13 Concrete Pavement Patch (full depth)*  S.Y. 367  $         74.50  $   27,341.50  $         85.00  $            31,195.00  $       147.40  $      54,095.80
14 Valve Adjustment EACH 7  $       190.00  $      1,330.00  $       350.00  $              2,450.00  $       380.00  $        2,660.00
15 Manhole Adjustment EACH 11  $       685.00  $      7,535.00  $       750.00  $              8,250.00  $    1,575.00  $      17,325.00
16 Cold Plastic Pavement Marking        $                  -      $                          -      $                    -  
  a)   6" White L.F. 4,310  $           3.15  $   13,576.50  $           3.05  $            13,145.50  $           3.35  $      14,438.50
  b)   4" Yellow L.F. 1,347  $           2.10  $      2,828.70  $           2.02  $              2,720.94  $           2.25  $        3,030.75
  c)   6" Yellow L.F. 450  $           4.15  $      1,867.50  $           4.00  $              1,800.00  $           4.40  $        1,980.00
  d)   24" Stop Bar L.F. 49  $           8.85  $         433.65  $           8.50  $                 416.50  $           9.35  $           458.15
  e)   3' x 6' Bar Crosswalk L.F. 144  $         12.50  $      1,800.00  $         12.00  $              1,728.00  $         13.20  $        1,900.80
  f)   Turn Arrow EACH 2  $       215.00  $         430.00  $       205.00  $                 410.00  $       225.00  $           450.00
  g)   Bicycle Symbol EACH 13  $       140.00  $      1,820.00  $       135.00  $              1,755.00  $       150.00  $        1,950.00
17 Traffic Signal Loops L.F. 236  $         10.65  $      2,513.40  $         12.00  $              2,832.00  $         11.30  $        2,666.80
18 Traffic Control L.S. 1  $ 26,100.00  $   26,100.00  $ 25,000.00  $            25,000.00  $ 17,920.00  $      17,920.00
19 Seeding, Fertilizer & Mulch  L.S. 1  $    8,565.00  $      8,565.00  $ 11,500.00  $            11,500.00  $ 23,224.00  $      23,224.00
20 Temporary Surfacing TONS 50  $         20.00  $      1,000.00  $         20.00  $              1,000.00  $         50.00  $        2,500.00
    Grand Total     $ 767,065.55    $         832,790.77  $    898,440.00
  * Estimated Quantities