Project No. 12-CR1-205(C)
2005 Concrete Repair Program, Phase 1
STREET |
FROM |
TO |
SIDE |
|
10TH ST. |
KASOLD DR. |
RANDALL RD. |
BOTH |
|
2905 TOPEKA LN. |
DRIVEWAY |
|
SOUTH |
|
BOB BILLINGS PKWY. |
WAKARUSA |
FOXFIRE DR. |
BOTH(OUTSIDE) |
|
CLINTON PKWY. |
OLYMPIC DR. |
LAKE POINTE DR. |
NORTH |
|
LOUISIANA |
EDGEHILL RD. |
17TH ST. |
BOTH |
|
OUSDAHL RD. |
26TH ST. |
INTERSECTION |
NORTH |
|
PRINCETON BLVD. |
ARROWHEAD DR. |
INTERSECTION |
BOTH |
|
TOMAHAWK DR. |
LAWRENCE AVE. |
ROCK FENCE PL. |
PATCHING |