Lawrence Municipal Airport
Lawrence, Kansas
AIP Project No. 3-20-0047-12
July 19, 2005
Bid Tabulation
Replace Medium Intensity Runway Lighting System for Runway 15-33 &
 Medium Intensity Taxiway Lighting System for Taxiway "A"
Engineer's Capitol Electric DACO Construction
Estimate Construction Co., Inc. Company, Inc. 
Item No. Description Quantity Unit Unit Cost Est. Cost Unit Cost Est. Cost   Unit Cost Est. Cost
                     
P-100 Mobilization 1 L.S. $11,600.00 11,600.00 $9,019.95 9,019.95 $9,761.00 9,761.00
L-108a Cable, 1/C #8, 5kV, L-824C 20,500 L.F. 1.50 30,750.00 1.20 24,600.00 1.25 25,625.00
L-108b Cable, 1/C #6 Bare Copper Counterpoise 16,000 L.F. 1.50 24,000.00 0.45 7,200.00 0.75 12,000.00
L-108c Cable, 1/C #6, 600V, XHHW Green Ground 16,000 L.F. 1.00 16,000.00 0.39 6,240.00 0.75 12,000.00
L-110a 1-Way, 2-Inch PVC Duct (DEB) 16,000 L.F. 4.50 72,000.00 1.77 28,320.00 4.50 72,000.00
L-110b 2-Way, 2-Inch PVC Duct (CE) 45 L.F. 50.00 2,250.00 46.25 2,081.25 35.00 1,575.00
L-110c 2-Way, 2-Inch Duct (Directional Drill) 215 L.F. 40.00 8,600.00 9.78 2,102.70 * 35.00 7,525.00
L-110d L-867 Size B Junction Box 2 Ea. 400.00 800.00 515.89 1,031.78 525.00 1,050.00
L-125a Remove Existing Edge Lights 1 L.S. 5,000.00 5,000.00 6,717.66 6,717.66 1,500.00 1,500.00
L-125b L-861 Elevated Runway Edge Light (Base Mount) 42 Ea. 575.00 24,150.00 879.38 36,933.96 675.00 28,350.00
L-125c L-861T Elevated Taxiway Edge Light (Base Mount) 63 Ea. 575.00 36,225.00 869.61 54,785.43 650.00 40,950.00
L-126 L-853 Retroreflective Taxiway Marker 6 Ea. 100.00 600.00 104.61 627.66 110.00 660.00
         
        Total $231,975.00 Total $179,660.39 * Total $212,996.00
L&S Electric. LLC Huxtrable & Associates, Inc.
     
Item No. Description Quantity Unit Unit Cost Est. Cost Unit Cost Est. Cost  
                 
P-100 Mobilization 1 L.S. $11,500.00 11,500.00 $5,000.00 5,000.00  
L-108a Cable, 1/C #8, 5kV, L-824C 20,500 L.F. 0.89 18,245.00 2.33 47,765.00 *
L-108b Cable, 1/C #6 Bare Copper Counterpoise 16,000 L.F. 0.80 12,800.00 1.27 20,320.00 *
L-108c Cable, 1/C #6, 600V, XHHW Green Ground 16,000 L.F. 0.82 13,120.00 1.12 17,920.00 *
L-110a 1-Way, 2-Inch PVC Duct (DEB) 16,000 L.F. 5.49 87,840.00 9.71 155,360.00 *
L-110b 2-Way, 2-Inch PVC Duct (CE) 45 L.F. 68.89 3,100.05 18.00 810.00  
L-110c 2-Way, 2-Inch Duct (Directional Drill) 215 L.F. 39.07 8,400.05 44.51 9,569.65 *
L-110d L-867 Size B Junction Box 2 Ea. 492.50 985.00 500.00 1,000.00  
L-125a Remove Existing Edge Lights 1 L.S. 6,231.00 6,231.00 9,453.34 9,453.34  
L-125b L-861 Elevated Runway Edge Light (Base Mount) 42 Ea. 599.00 25,158.00 641.58 26,946.36 *
L-125c L-861T Elevated Taxiway Edge Light (Base Mount) 63 Ea. 599.00 37,737.00 609.88 38,422.44  
L-126 L-853 Retroreflective Taxiway Marker 6 Ea. 200.00 1,200.00 100.00 600.00  
       
        Total $226,316.10 Total $333,166.79 *
*  Indicates correction to the extended bid price