CITY OF LAWRENCE
Project No. 15-CP4-305(BD)                                     
Hanscom-Tappan Addition, 2nd Plat
Street, Storm Sewer Improvements
BID TAB
Engineer's Estimate:  $187,358.00 
Bid Date:  October 18, 2005
R. D. Johnson Excavating Linaweaver Construction Meadows Construction Co.
ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT
  STREET                
1 Clearing, Grubbing and Tree Removal L.S. 1  $       7,000.00  $        7,000.00  $       21,500.00  $   21,500.00  $       25,877.00  $     25,877.00
2 Topsoil Removal/Replacement C.Y. 642  $             5.00  $        3,210.00  $               5.00  $     3,210.00  $             11.00  $       7,062.00
3 Unclassified Excavation C.Y. 1512  $             7.00  $      10,584.00  $             10.00  $   15,120.00  $             12.00  $     18,144.00
4 Compacted Fill C.Y. 34  $           20.00  $           680.00  $             10.00  $        340.00  $               8.60  $         292.40
5 Asphalt Surface Course Ton 144  $           42.00  $        6,048.00  $             57.50  $     8,280.00  $             76.00  $     10,944.00
6 Asphalt Base Course Ton 463  $           40.00  $      18,520.00  $             47.00  $   21,761.00  $             62.00  $     28,706.00
7 Type I Concrete Curb and Gutter L.F. 768  $           14.00  $      10,752.00  $             10.00  $     7,680.00  $             15.00  $     11,520.00
8 Type II Concrete Curb and Gutter L.F. 240  $           16.00  $        3,840.00  $             12.00  $     2,880.00  $               9.00  $       2,160.00
9 5' x 4" Concrete Sidewalk L.F. 658  $           16.25  $      10,692.50  $             12.25  $     8,060.50  $             15.00  $       9,870.00
10 6' x 4" Concrete Sidewalk L.F. 142  $           19.50  $        2,769.00  $             18.00  $     2,556.00  $             28.00  $       3,976.00
11 5' x 6" Concrete Sidewalk L.F. 240  $           25.50  $        6,120.00  $             20.00  $     4,800.00  $             15.00  $       3,600.00
12 6' Concrete Access Ramp Each 2  $       1,200.00  $        2,400.00  $         1,000.00  $     2,000.00  $         1,750.00  $       3,500.00
13 Residential Entrance* Each 12  $         600.00  $        7,200.00  $           600.00  $     7,200.00  $         1,135.00  $     13,620.00
14 Concrete Speed Hump Each 1  $         850.00  $           850.00  $         2,800.00  $     2,800.00  $         6,813.00  $       6,813.00
15 Signs (W17-1 and W16-7P) L.S. 1  $       1,400.00  $        1,400.00  $         1,320.00  $     1,320.00  $         1,742.00  $       1,742.00
16 Speed Hump Pavement Markings L.S. 1  $       2,850.00  $        2,850.00  $         3,025.00  $     3,025.00  $         3,994.00  $       3,994.00
17 Treatment of Subgrade (16% Class C Flyash) S.Y. 1473  $             4.75  $        6,996.75  $               5.00  $     7,365.00  $             10.90  $     16,055.70
18 8" Reinforced Durable Aggregate Concrete S.Y. 104  $           45.00  $        4,680.00  $             45.00  $     4,680.00  $             64.00  $       6,656.00
19 Remove Existing Concrete Curb and Gutter L.F. 97  $             5.00  $           485.00  $               6.00  $        582.00  $             14.00  $       1,358.00
20 Remove Existing Pavement S.Y. 54  $             6.00  $           324.00  $             10.00  $        540.00  $             20.00  $       1,080.00
21 Remove Existing Single Beam Guard Rail L.F. 27  $           10.00  $           270.00  $               1.00  $         27.00  $             12.00  $         324.00
22 Remove Existing Rip Rap S.Y. 30  $             8.00  $           240.00  $               1.00  $         30.00  $             23.00  $         690.00
23 Remove Existing 'Future Street Extension' Sign Each 1  $         100.00  $           100.00  $               1.00  $           1.00  $           363.00  $         363.00
24 Seeding, Mulching, and Fertilizing L.S. 1  $       1,500.00  $        1,500.00  $         1,000.00  $     1,000.00  $           953.00  $         953.00
25 Construction Staking L.S. 1  $       1,600.00  $        1,600.00  $         1,500.00  $     1,500.00  $         1,500.00  $       1,500.00
26 Traffic Control on Haskell Avenue L.S. 1  $       3,800.00  $        3,800.00  $         1,000.00  $     1,000.00  $         5,810.00  $       5,810.00
  STORM SEWER        $                 -      $              -      $                -  
27 5' x 4' Curb Inlet Each 1  $       3,000.00  $        3,000.00  $         2,700.00  $     2,700.00  $         2,832.00  $       2,832.00
28 6' x 4' Curb Inlet Each 1  $       3,400.00  $        3,400.00  $         2,900.00  $     2,900.00  $         3,050.00  $       3,050.00
29 15" CMP L.F. 34  $           32.00  $        1,088.00  $             45.00  $     1,530.00  $             47.00  $       1,598.00
30 24" CMP L.F. 18  $           40.00  $           720.00  $             75.00  $     1,350.00  $             64.00  $       1,152.00
31 Flowable Mortar C.Y. 23  $           55.00  $        1,265.00  $             75.00  $     1,725.00  $           116.00  $       2,668.00
32 Connect to Existing 24" CMP Each 1  $         400.00  $           400.00  $           100.00  $        100.00  $           434.00  $         434.00
33 Remove Existing 24" CMP End Section Each 1  $         125.00  $           125.00  $             10.00  $         10.00  $           218.00  $         218.00
34 Remove Existing 18" Nominal Diameter Rip Rap S.Y. 5  $           30.00  $           150.00  $             10.00  $         50.00  $             82.00  $         410.00
35 Remove Existing 6' x 4' Curb Inlet and Utilities Each 1  $       1,100.00  $        1,100.00  $           500.00  $        500.00  $         2,003.00  $       2,003.00
36 Seeding, Mulching, and Fertilizing L.S. 1  $         800.00  $           800.00  $         1,000.00  $     1,000.00  $         1,200.00  $       1,200.00
  STORMWATER POLLUTION PREVENTION        $                 -      $              -      $                -  
37 Silt Fence L.F. 816  $             2.50  $        2,040.00  $               2.00  $     1,632.00  $               3.00  $       2,448.00
38 Temporary Inlet Sediment Barrier Each 2  $         150.00  $           300.00  $           100.00  $        200.00  $           369.00  $         738.00
39 Temporary Gravel Entrance Pad Each 1  $         800.00  $           800.00  $           800.00  $        800.00  $         3,243.00  $       3,243.00
  GRAND TOTAL        $    130,099.25    $ 143,754.50    $   208,604.10