Memorandum
City of Lawrence
Public Works
|
TO: |
Charles Soules, P.E., Director of Public Works
|
|
FROM: |
David P. Cronin, P.E., City Engineer
|
|
CC: |
Mark Thiel, Assistant Director of Public Works
|
|
Date: |
July 15, 2013
|
|
RE: |
Adopt Resolution No. 7035 for Project PW1303 - 9th & Kentucky Signal Improvements |
|
|
Adopt Resolution No. 7036 for Project PW1302 - 9th Street: Emery to Michigan Geometric Improvements and Signal Improvements |
Please include the following item on the City Commission Agenda for consideration at the July 23, 2013 meeting.
Project Description
The 9th & Kentucky and 9th & Michigan intersections were both approved for funds through KDOT's Highway Safety Improvement Program. The project at 9th & Kentucky will install a signal system including longer mast arms, new signal heads, pedestrian heads and upgraded sidewalk ramps. The signals will align with the new lane configuration being installed with the 9th & Tennessee project that is scheduled to begin this August.
The 9th Street, Emery to Michigan project includes geometric improvements to provide a center, two-way left turn lane between Emery and Michigan Street. Installation of new sidewalk and a new signal at 9th & Emery is included in project.
Project Status/Schedule
The 9th & Kentucky project is currently being design in-house by city staff. Final plans are anticipated to be complete in August with a KDOT letting of October 16, 2013. Construction will begin in early 2014.
The 9th Street, Emery to Michigan project will be designed in-house by city staff. Final plans are to be complete in January 2014 with a KDOT letting of March 19, 2014. Construction will occur in summer 2014.
Project Funding
Both projects are funded at a 90/10 (KDOT/City) match with maximum participation amounts from KDOT. Project funding summary is as follows:
|
Project |
Estimated Project Cost |
KDOT (max.) |
City |
|
9th & Kentucky |
$240,000 |
$200,000 |
$40,000 |
|
9th: Emery to Michigan |
$600,000 |
$500,000 |
$100,000 |
Design is being done in-house with City staff and design costs are not included in project costs.
Action Requested
Adopt Resolution No. 7035, authorizing $40,000 in general obligation bonds for the improvements at 9th & Kentucky and adopt Resolution No. 7036, authorizing $100,000 in general obligation bonds for the improvements on 9th Street from Emery to Michigan.