| 2014 Sidewalk Inventory Defect Report | 4/24/2014 | ||||||||
| Overall | Defect LF | x 5 feet wide | x $6 sqft | ||||||
| Overall Total | 203,658 | 1018290 | $ 6,109,740 | ||||||
| Arterial | 28,045 | ||||||||
| Collector | 45,559 | ||||||||
| Residential | 130,054 | ||||||||
| Vertical Deflection less than or equal to 1" | 70,590 | ||||||||
| Vertical Deflection more than 1" | 84,076 | ||||||||
| Horizontal Gap | 1,516 | ||||||||
| Tree Roots | 10,346 | ||||||||
| Cross Slope | 9,250 | ||||||||
| Brick Reset | 20,398 | * construction costs would be calculated differently | |||||||
| Manhole | 4,126 | ||||||||
| Missing Sidewalk | 3,356 | should be thought of as length of missing panels in a continuous sidewalk | |||||||
| Arterial Defect Breakdown | Defect LF | x 6 feet wide | x $7 sq ft | ||||||
| Arterial Overall | 28,045 | 168,270 | $ 1,177,890 | ||||||
| Vertical Deflection less than or equal to 1" | 10,555 | ||||||||
| Vertical Deflection more than 1" | 10,801 | ||||||||
| Horizontal Gap | 80 | ||||||||
| Tree Roots | 655 | ||||||||
| Cross Slope | 2,370 | ||||||||
| Brick Reset | 1,706 | * construction costs would be calculated differently | |||||||
| Manhole | 1,522 | ||||||||
| Missing Sidewalk | 356 | should be thought of as length of missing panels in a continuous sidewalk | |||||||
| Collector Defect Breakdown | Defect LF | x 5 feet wide | x $6.5 sq ft | ||||||
| Collector Overall | 45,552 | 227,760 | $ 1,480,440 | ||||||
| Vertical Deflection less than or equal to 1" | 16,582 | ||||||||
| Vertical Deflection more than 1" | 18,666 | ||||||||
| Horizontal Gap | 421 | ||||||||
| Tree Roots | 2,012 | ||||||||
| Cross Slope | 1,685 | ||||||||
| Brick Reset | 4,845 | * construction costs would be calculated differently | |||||||
| Manhole | 888 | ||||||||
| Missing Sidewalk | 460 | should be thought of as length of missing panels in a continuous sidewalk | |||||||
| Residential Defect Breakdown | Defect LF | x 5 ft wide | x $6 sqft | ||||||
| Residential Overall | 130,054 | 650,270 | $ 3,901,620 | ||||||
| Vertical Deflection less than or equal to 1" | 43,453 | ||||||||
| Vertical Deflection more than 1" | 54,609 | ||||||||
| Horizontal Gap | 1,015 | ||||||||
| Tree Roots | 7,679 | ||||||||
| Cross Slope | 5,195 | ||||||||
| Brick Reset | 13,847 | * construction costs would be calculated differently | |||||||
| Manhole | 1,716 | ||||||||
| Missing Sidewalk | 2,540 | should be thought of as length of missing panels in a continuous sidewalk | |||||||