Memorandum
City of Lawrence
Public Works
TO: |
Charles F. Soules, P.E., Public Works Director |
FROM: |
Robert Aaron Public Works Fleet Manager |
CC: |
Mark Thiel, Assistant Public Works Director David Cronin, Public Works Engineer |
DATE: |
11/20/2015 |
RE: |
Purchase of two (2) Half ton trucks |
Background
The City Commission authorized funds for the replacement of engineering department equipment in the 2016 budget process. Bids were sent as required by the City’s purchasing policy. Units 719, a 2000 Chevrolet 1500, and 720, a 2002 Ford Ranger, have been identified as units at the end of their useable life. Both units have high repair costs and meet the City’s replacement criteria. The equipment replacement schedule is based on age, mileage, hours of use, and cost of maintenance and upkeep.
Staff Recommendation
Central Maintenance Garage and Engineering staff recommend the purchase of two (2) half ton trucks from Laird Noller Ford following the city’s one percent local preference policy.
Vendor |
Net Bid |
Meets Specification |
|
Laird Noller Ford |
$45,118.00 |
Yes |
Meets the 1% purchasing policy |
Shawnee Mission Ford |
$44,736.00 |
Yes |
|
Funding
Funding for this purchase was approved in the 2016 budget process and the purchase order will be issued in January 2016.
Action
Authorize the Engineering Division to purchase two (2) half ton trucks form Laird Noller Ford for the amount of $45,118 following the City’s one percent local preference purchasing policy.