March 7, 2018 Minutes
|
MEMBERS PRESENT: |
|
Chair Daniel Poull, Vice Chair Brian Landon and Doug Dillon |
|
|
|
|
|
MEMBERS ABSENT: |
|
Chuck Hoag |
|
|
|
|
|
GUEST PRESENT: |
|
Bobbie Flory |
|
|
|
|
|
Ex-Officio: |
|
Mark Mills, Building Inspector |
|
|
|
|
Call meeting to order.
Acting Chair Dillon called the meeting to order at 4:00 p.m.
Introductions.
The Board Members and guest introduced themselves.
Elect Chair and Vice Chair.
Landon nominated Poull for Chair. Dillon second the nomination, the nomination was approved 3-0.
Poull nominated Landon for Vise Chair. Dillon second the nomination, the nomination was approved 3-0.
Approve the August 19, 2015 minutes.
Dillon made a motion to approve the minutes. Landon second the motion, the motion passed 3-0.
Review 2018 Codes.
The Board started the 2018 International Plumbing Code.
Landon made
a motion to delete the first sentence of §312.3 Drainage and vent air
test. Plastic piping shall not be tested using air. An air test
shall be made by forcing air into the system until there is a uniform gauge
pressure of 5 psi (34.5 kPa) or sufficient to balance a 10-inch (254 mm) column
of mercury. This pressure shall be held for a test period of not less than 15
minutes. Any adjustments to the test pressure required because of changes in
ambient temperatures or the seating of gaskets shall be made prior to the
beginning of the test period. Dillon second the motion, the motion passed 3-0.
Landon made
a motion to delete a portion of the first sentence of §312.5 Water
supply system test. Upon completion of a section of or the entire water
supply system, the system, or portion completed, shall be tested and proved
tight under a water pressure not less than the working pressure of the system;
or, for piping systems other than plastic, by an air test of not less
than 50 psi (344 kPa). This pressure shall be held for not less than 15
minutes. The water utilized for tests shall be obtained from a potable source
of supply. The required tests shall be performed in accordance with this
section and Section 107. Dillon second the motion, the motion passed 3-0.
Dillon made
a motion to delete §312.6 Gravity sewer test. Gravity sewer tests
shall consist of plugging the end of the building sewer at the point of
connection with the public sewer, filling the building sewer with water,
testing with not less than a 10-foot (3048 mm) head of water and maintaining
such pressure for 15 minutes. Landon second the motion, the
motion passed 3-0.
New Business
There was no new business.
Adjourn
With no other business Poull made a motion to adjourn. Dillon second the motion, the motion passed 3-0.
Poull adjourned the meeting at 5:10 p.m.
|
Members |
03/07/2018 |
04/11/2018 |
|
|
|
|
|
|
|
|
|
|
|
Daniel Poull |
P |
|
|
|
|
|
|
|
|
|
|
|
|
Chuck Hoag |
A |
|
|
|
|
|
|
|
|
|
|
|
|
Doug Dillon |
P |
|
|
|
|
|
|
|
|
|
|
|
|
Brian Landon |
P |
|
|
|
|
|
|
|
|
|
|
|