GENERAL
OPERATING FUND |
STREET MAINTENANCE |
PURPOSE AND MISSION OF THE DEPARTMENT /
DIVISION |
GENERAL
OPERATING FUND |
ENGINEERING |
PURPOSE AND MISSION OF THE DEPARTMENT /
DIVISION |
GENERAL
OPERATING FUND |
TRAFFIC
ENGINEERING |
PURPOSE AND MISSION OF THE DEPARTMENT /
DIVISION |
GENERL
OPERATING FUND |
AIRPORT |
PURPOSE AND MISSION OF THE DEPARTMENT /
DIVISION |
GENERAL
OPERATING FUND |
BUILDING
MAINTENANCE |
PURPOSE AND MISSION OF THE DEPARTMENT /
DIVISION |
GENERAL
OPERATING FUND |
STREET
LIGHTS |
|
|
|
|
|
|
GENERAL
OPERATING FUND |
LEVEE
MAINTENANCE |
PURPOSE AND MISSION OF THE DEPARTMENT /
DIVISION |
| |
|
|
ACCOUNT 001-3000-570 |
|
The Street Maintenance Division is
responsible for the routine maintenance of the City’s streets, alleys,
curbs, and gutters. The budget provides funds for concrete, asphalt, sand,
rock, and salt for snow and ice control. Additional funds are budgeted for
outside firms to assist in removing snow. The work crews require the use of
variety of equipment and vehicles. The cost of equipment maintenance and
fuel is included in this budget.
Significant Issues for 2003 -
Personal Services expenditures will be reduced for this division in 2003
due to a transfer of a position to another division within the department.
|
|
|
|
|
|
ACCOUNT 001-3100-571 |
|
The Engineering Division is
responsible for the review and approval of all plans for streets, sanitary
sewers, sidewalks, and storm sewers. The division administers these
projects and inspects project construction. This division evaluates pavement condition and contracts for
major pavement restoration and replacement. The Engineering
Division solicits grants and other funding for major reconstruction
or new construction projects.
The Engineering staff offers technical assistance to other departments in
consultant selection and contract administration. The office of the City
Engineer is the custodian of “as
built” plans as well as various maps and aerial photography information
used extensively by builders, developers, and consultant engineers working
in the City. The GIS functions of
the City are supported through this division, as well as other City
departments.
Significant
Issues for 2003 - The increase in Personal
Services for 2003 can be attributed to the 3% general wage adjustment and
merit increases for eligible employees.
|
|
|
|
|
|
ACCOUNT 001-3200-572 |
|
The Traffic Engineering Division was
established in 1994 as a separate budget division. The Traffic Engineering Division reviews
plats and site plans, street plans, analyzes traffic data, and provides
professional and technical data to the Traffic Safety Commission. Field crews are responsible for signal
maintenance, signal timing, street signs, and pavement markings.
The Traffic Engineer Division works with community and neighborhood groups
to address specific concerns.
Significant
Issues for 2003 - The increase in Personal
Services for 2003 can be attributed to the 3% general wage adjustment and
merit increases for eligible employees.
|
|
|
|
|
|
ACCOUNT 001-3300-573 |
|
The Lawrence Municipal Airport is operated by a fixed base operator under
agreement with the City. The Assistant City Manager-Community Development
serves as Airport Manager, however, maintenance of the airport remains the
responsibility of the Public Works Department. The Director of Public Works
is responsible for such maintenance as is required.
Contractual agreements such as insurance and electricity are budgeted in
this division as well as capital expenditures for maintenance and
improvements.
Significant
Issues for 2003 - The increase in Personal
Services for 2003 can be attributed to the 3% general wage adjustment and
merit increases for the eligible employee assigned to this division.
|
|
|
|
|
|
ACCOUNT 001-3400-574 |
|
This division is responsible for
building maintenance for municipal buildings except where such services are
provided contractually. In addition to maintenance costs, utility costs for
some buildings are paid out of this division’s budget. The costs of operation
of the Law Enforcement Center, which are shared with the County, are
budgeted in this section. The
division provides maintenance services and/or technical support for
approximately 30 facilities: City
Hall; Court Services; five Pubic Works facilities; Fire/Medical facilities;
six buildings at the Lawrence Municipal Airport; the Public Library; the
Police annex facility; the Riverfront Parking Garage; the Downtown 2000
(New Hampshire Street) Parking Garage and four city owned buildings
occupied by community service agencies – the Arts Center, Health Care
Access, Lawrence/Douglas County Senior Center, and the Community Health
facility. The division also
provides assistance with downtown lighting, canopies, and various buildings
at cemetery. Funding is
decentralized for many of these facilities.
Significant Issues for 2003 - The
increase in Personal Services for 2003 can be attributed to the 3% general
wage adjustment and merit increases for eligible employees. The increase in Contractual Services can
be attributed to maintenance contracts for the Arts Center.
|
|
|
|
|
|
ACCOUNT 001-3600-576 |
|
|
ACCOUNT 001-3700-577 |
|
The Levee maintenance budget is for personnel, equipment, and materials to
maintain the flood control levee along the Kansas River and Mud Creek.
Operations are partially funded by the KAW Drainage District. This budget provides for weed control,
mowing, and slope repair along the length of the levee as well as
maintenance of the flood control gates.
Significant Issues for 2003 - The
increase in Personal Services for 2003 can be attributed to the 3% general
wage adjustment and merit increases for eligible employees.
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
2003 DEPARTMENT / DIVISION SPENDING SUMMARY |
|
2003 DEPARTMENT / DIVISION SPENDING SUMMARY |
|
2003 DEPARTMENT / DIVISION SPENDING SUMMARY |
|
2003 DEPARTMENT / DIVISION SPENDING SUMMARY |
|
2003 DEPARTMENT / DIVISION SPENDING SUMMARY |
|
2003 DEPARTMENT / DIVISION SPENDING SUMMARY |
|
2003 DEPARTMENT / DIVISION SPENDING SUMMARY |
|
| Public Works Department |
EXPENDITURES
|
2001 Actual |
2002 Adopted |
2002 Estimate |
2003 Budget |
|
EXPENDITURES
|
2001 Actual |
2002 Adopted |
2002 Estimate |
2003 Budget |
|
EXPENDITURES
|
2001 Actual |
2002 Adopted |
2002 Estimate |
2003 Budget |
|
EXPENDITURES
|
2001 Actual |
2002 Adopted |
2002 Estimate |
2003 Budget |
|
EXPENDITURES
|
2001 Actual |
2002 Adopted |
2002 Estimate |
2003 Budget |
|
EXPENDITURES
|
2001 Actual |
2002 Adopted |
2002 Estimate |
2003 Budget |
|
EXPENDITURES
|
2001 Actual |
2002 Adopted |
2002 Estimate |
2003 Budget |
|
| Personal
Services |
$
199,030 |
$
246,819 |
$
246,819 |
$
214,901 |
|
Personal Services |
$
550,550 |
$
599,207 |
$
599,207 |
$
626,939 |
|
Personal Services |
$
349,231 |
$
394,659 |
$
394,659 |
$
396,142 |
|
Personal Services |
$
27,589 |
$
29,987 |
$
29,987 |
$
32,798 |
|
Personal Services |
$
176,966 |
$
199,902 |
$
199,902 |
$
202,838 |
|
Personal Services |
$ - |
$ - |
$ - |
$ - |
|
Personal Services |
$
50,036 |
$
60,106 |
$
60,106 |
$
64,511 |
|
| Contractual
Services |
193,798 |
284,650 |
284,650 |
287,150 |
|
Contractual Services |
29,414 |
43,850 |
43,850 |
43,350 |
|
Contractual Services |
46,885 |
57,240 |
57,240 |
56,950 |
|
Contractual Services |
52,119 |
64,800 |
64,800 |
64,800 |
|
Contractual Services |
349,131 |
534,910 |
534,910 |
577,766 |
|
Contractual Services |
439,423 |
467,000 |
467,000 |
490,000 |
|
Contractual Services |
26,504 |
21,000 |
21,000 |
21,000 |
|
| Commodities |
538,560 |
1,438,350 |
1,438,350 |
1,438,350 |
|
Commodities |
29,041 |
42,150 |
42,150 |
42,650 |
|
Commodities |
79,081 |
105,050 |
105,050 |
104,550 |
|
Commodities |
917 |
2,070 |
2,070 |
2,070 |
|
Commodities |
30,525 |
26,800 |
26,800 |
26,800 |
|
Commodities |
- |
- |
- |
- |
|
Commodities |
6,152 |
8,600 |
8,600 |
8,000 |
|
| Capital
Outlay |
- |
- |
- |
- |
|
Capital Outlay |
24,950 |
34,500 |
34,500 |
34,500 |
|
Capital Outlay |
42,612 |
21,710 |
21,710 |
21,000 |
|
Capital Outlay |
- |
10,100 |
10,100 |
10,100 |
|
Capital Outlay |
17,313 |
19,600 |
19,600 |
19,600 |
|
Capital Outlay |
- |
- |
- |
- |
|
Capital Outlay |
6,409 |
10,400 |
10,400 |
11,000 |
|
| Debt
Service |
- |
- |
- |
- |
|
Debt Service |
- |
- |
- |
- |
|
Debt Service |
- |
- |
- |
- |
|
Debt Service |
- |
- |
- |
- |
|
Debt Service |
- |
- |
- |
- |
|
Debt Service |
- |
- |
- |
- |
|
Debt Service |
- |
- |
- |
- |
|
| Transfers |
- |
- |
- |
- |
|
Transfers |
- |
- |
- |
- |
|
Transfers |
- |
- |
- |
- |
|
Transfers |
15,000 |
15,000 |
15,000 |
15,000 |
|
Transfers |
- |
- |
- |
- |
|
Transfers |
- |
- |
- |
- |
|
|
|
|
|
|
|
 |
|
|
www.lawrenceks.org
|
|
|
Transfers |
- |
- |
- |
- |
|
| Contingency |
- |
100,000 |
100,000 |
100,000 |
|
Contingency |
- |
- |
- |
- |
|
Contingency |
- |
- |
- |
- |
|
Contingency |
- |
- |
- |
- |
|
Contingency |
- |
- |
- |
- |
|
Contingency |
- |
- |
- |
- |
Contingency |
- |
- |
- |
- |
|
| Total |
$
931,388 |
$
2,069,819 |
$
2,069,819 |
$
2,040,401 |
|
Total |
$
633,955 |
$
719,707 |
$
719,707 |
$
747,439 |
|
Total |
$
517,809 |
$
578,659 |
$
578,659 |
$
578,642 |
|
Total |
$
95,625 |
$
121,957 |
$
121,957 |
$
124,768 |
|
Total |
$
573,935 |
$
781,212 |
$
781,212 |
$
827,004 |
|
Total |
$
439,423 |
$
467,000 |
$
467,000 |
$
490,000 |
Total |
$
89,101 |
$
100,106 |
$
100,106 |
$
104,511 |
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
DEPARTMENT /
DIVISION PERSONNEL SUMMARY |
CURRENT YEAR ACCOMPLISHMENTS |
DEPARTMENT / DIVISION PERSONNEL SUMMARY |
CURRENT YEAR ACCOMPLISHMENTS |
DEPARTMENT / DIVISION PERSONNEL SUMMARY |
CURRENT YEAR ACCOMPLISHMENTS |
DEPARTMENT / DIVISION PERSONNEL SUMMARY |
CURRENT YEAR ACCOMPLISHMENTS |
DEPARTMENT / DIVISION PERSONNEL SUMMARY |
CURRENT YEAR ACCOMPLISHMENTS |
DEPARTMENT / DIVISION PERSONNEL SUMMARY |
DEPARTMENT /
DIVISION PERSONNEL SUMMARY |
CURRENT YEAR ACCOMPLISHMENTS |
| |
Street Maintenance |
|
PERSONNEL |
2001 Actual |
2002 Adopted |
2002 Estimate |
2003 Budget |
|
|
l
Performed concrete and asphalt repair,
and crack sealing
programs.
l Provided dependable snow removal and
ice control operations.
|
|
|
|
|
|
l Repaired portions of Wakarusa Drive and
prepared for the reconstruction
of the 15th
and Wakarusa intersection.
|
|
|
|
PERSONNEL |
2001 Actual |
2002 Adopted |
2002 Estimate |
2003 Budget |
|
|
l
Significant annual contracts were bid and
completed for the Overlay and
Curb
Repair Program.
l Progress has been made on various
large
construction and renovation
projects, such
as Riverridge Road and West 6th
Street.
|
|
|
|
|
|
l GIS
implementation continues with a high
degress of accuracy.
l A half-time Assistant
City Engineer was
added to staff, greatly
increasing our
capacity to provide accurate and
timely
review of plans,
and other administrative
engineering functions.
|
|
|
|
PERSONNEL |
2001 Actual |
2002 Adopted |
2002 Estimate |
2003 Budget |
|
|
l Traffic signal
upgrades including 6th &
Kasold Dr., 6th & Lawrence
Ave., and
Clinton Prkwy & Lawrence
Ave..
l A new traffic signal at the intersection of
US 24-40-59 is being maintained
by city
personnel.
l A GPS system for traffic sign and
signal
inventory will be implemented
this year.
|
|
|
|
|
|
l A
program of periodic traffic counts on
collector streets is being
implemented.
l The traffic signal priority list has been updated
using current traffic volumes
and crash data.
l All school area signing is in the process of
being converted to higher
visibility fluorescent
yellow green.
|
|
|
|
PERSONNEL |
2001 Actual |
2002 Adopted |
2002 Estimate |
2003 Budget |
|
|
l
Significant federal grants were secured for
runway extensions related
improvements.
|
|
|
|
|
|
l Facility
improvements include sidewalk
and roof replacement.
|
|
|
|
PERSONNEL |
2001 Actual |
2002 Adopted |
2002 Estimate |
2003 Budget |
|
|
l Building
inventory and current building
information on project
sheets.
l Major roof repairs or complete
replacement -- Streets, SWAN,
airport.
|
|
|
|
|
|
l Phase IV
on City Hall HVAC renovation.
l Technical support for airport improvement
projects.
|
|
|
|
PERSONNEL |
2001 Actual |
2002 Adopted |
2002 Estimate |
2003 Budget |
PERSONNEL |
2001 Actual |
2002 Adopted |
2002 Estimate |
2003 Budget |
|
|
l Provided
maintenance of the levee
system, including mowing, weed
control,
flood control gate maintenance,
and
modifications to
the access gates.
|
|
|
|
|
| |
Engineering |
|
Authorized
Positions |
6.00 |
6.25 |
6.25 |
5.25 |
Authorized
Positions |
9.65 |
10.16 |
10.16 |
10.16 |
Authorized
Positions |
8.00 |
8.00 |
8.00 |
8.00 |
Authorized
Positions |
1.00 |
1.00 |
1.00 |
1.00 |
Authorized
Positions |
3.00 |
4.25 |
4.25 |
4.00 |
Authorized
Positions |
0.00 |
0.00 |
0.00 |
0.00 |
Authorized
Positions |
2.00 |
2.00 |
2.00 |
2.00 |
| |
Traffic Engineering |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Airport |
|
DEPARTMENT / DIVISION ORGANIZATIONAL CHART |
DEPARTMENT / DIVISION ORGANIZATIONAL CHART |
DEPARTMENT / DIVISION ORGANIZATIONAL CHART |
DEPARTMENT / DIVISION ORGANIZATIONAL CHART |
DEPARTMENT / DIVISION ORGANIZATIONAL CHART |
DEPARTMENT/DIVISION
ORGANIZATIONAL CHART |
DEPARTMENT / DIVISION ORGANIZATIONAL CHART |
| |
Building Maintenance |
|
|
|
|
|
|
|
|
| |
Street Lights |
|
MAJOR GOALS AND OBJECTIVES FOR 2003 |
MAJOR GOALS AND OBJECTIVES FOR 2003 |
MAJOR GOALS AND OBJECTIVES FOR 2003 |
|
|
MAJOR GOALS AND OBJECTIVES FOR 2003 |
|
MAJOR GOALS AND OBJECTIVES FOR 2003 |
Services are contracted through Westar Energy. |
|
|
MAJOR GOALS AND OBJECTIVES FOR 2003 |
| |
|
|
1. To provide curb, gutter, and
concrete repair and maintenance.
2. To provide general asphalt / concrete maintenance through patching and
replacement.
3. To enhance pavement maintenance through a crack sealing / surface
treatment (microsurfacing)
programs.
4. To provide effective snow and ice control for public roadways.
5. To provide support, personnel, and equipment during emergency
response and disaster recovery
operations.
|
|
|
|
1. To develop and maintain
infrastructure location and condition data.
2. To implement Public Works section of GIS system.
3. To continue implementation of automated drafting systems.
4. To provide
thorough inspection of all public improvements.
5. Review and update pavement
specifications including subgrade and materials.
|
|
|
|
1. To provide traffic signal,
traffic signing, and pavement marking public services at the current level
without
an increase in funding.
2. To inventory approximately 20% of the traffic
control signs in place in the field.
3. To complete a switch from incandescent lamps to LED's (light emitting
diodes) in all pedestrian signals.
4. Continue working with neighborhood organizations to provide solutions
to traffic problems that can
improve the quality of life
within the neighborhood.
5. To provide training, certification, and continuing education
opportunities for all personnel.
|
|
|
|
|
1. To continue maintenance of
primary runways and taxiways.
2. To provide routine inspections for regulatory compliance.
3. To provide facility and grounds maintenance at the airport terminal and
hangars, by agreement.
4. To complete airport expansion projects to extend the taxiway and 15-33
runway and to complete wetland
mitigation project.
|
|
|
|
|
1. Research older building
information to complete data and project sheets.
2. Complete final stage of City Hall HVAC renovation to maximize the
efficient of the facility, as well as the
comfort and productivity of occupants.
3. Assist with completion of new hangar at airport.
4. Overall improvements downtown, consistent with City Commission goals,
including lighting, electrical,
overall appearance).
|
|
|
|
|
1. To provide continuous maintenance
for the levee system.
2. To meet all regulatory requirements as provided by the U.S. Army Corps
of Engineer.
3. To protect North Lawrence from flooding from the Kansas River or Mud
Creek.
|
|
|
| |
Levee |
|
|
|
|
|
|
PURPOSE AND MISSION OF THE
DEPARTMENT/DIVISION |
|
| |
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
The lighting of city streets is
paid out of this section. With the exception of streetlights in the
downtown area, the City does not own any streetlights. Westar Energy owns
and maintains the lights. Cost for lighting varies based on the wattage of
the light used and the type of pole that the light is mounted on (steel,
aluminum, or wood). This division
also funds electricity fees for traffic signals.
Significant Issues for 2003 - The
increase in Contractual Services for 2003 can be attributed to an estimated
increase from Westar Energy for the cost of lighting, and additional
contractual work, such as underground trenching to install street lights on
West 15th Street.
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
| |
|
|
PERFORMANCE
INDICATORS |
PERFORMANCE
INDICATORS |
PERFORMANCE
INDICATORS |
|
PERFORMANCE
INDICATORS |
PERFORMANCE
INDICATORS |
|
|
PERFORMANCE
INDICATORS |
| |
Charles F. Soules, P.E.
Director |
|
|
2000 Actual |
2001 Actual |
2002 Estimated |
2003 Projected |
|
2000 Actual |
2001 Actual |
2002 Estimated |
2003 Projected |
|
2000 Actual |
2001 Actual |
2002 Estimated |
2003 Projected |
|
|
2000 Actual |
2001 Actual |
2002 Estimated |
2003 Projected |
|
|
2000 Actual |
2001 Actual |
2002 Estimated |
2003 Projected |
|
|
|
2000 Actual |
2001 Actual |
2002 Estimated |
2003 Projected |
| |
|
Number of Street Miles |
NA |
276 |
280 |
282 |
Projects constructed / inspected |
90 |
76 |
75 |
75 |
Number of traffic signals
maintained |
75 |
78 |
79 |
80 |
|
Number of hangars maintained |
4 |
4 |
4 |
4 |
|
Number of facilities maintained
/ supported |
27 |
27 |
28 |
28 |
|
|
Number of gates maintained |
16 |
16 |
16 |
16 |
| |
|
Miles of street sweeping
completed |
NA |
1,765 |
1,700 |
1,700 |
Number of street miles |
271 |
276 |
280 |
282 |
Number of school beacons |
35 |
33 |
33 |
35 |
|
Feet of runway maintained |
8902 |
9602 |
9602 |
10,302 |
|
|
|
|
* Shading indicates positions funded from
this account. |
Miles of levee maintained |
16 |
16 |
16 |
16 |
| |
|
|
* Shading indicates positions funded from
this account. |
Linear feet of curb and gutter
repaired |
NA |
12,623 |
8,000 |
10,000 |
|
Value of public improvements
administered |
NA |
14 million |
10 million |
10 million |
|
|
* Shading indicates positions funded from
this account. |
Number of buildings maintained |
5 |
6 |
6 |
6 |
* Shading indicates positions funded from
this account. |
|
|
|
Acres of land maintained |
2600 |
2600 |
2600 |
2600 |
| |
|
|
Tons of asphalt placed |
NA |
4,613 |
5,000 |
5,000 |
* Shading indicates positions funded from
this account. The Public Works Director position is funded 50% from this
account and 50% from the Solid Waste Fund (pg.L-4). |
Miles street overlay completed |
NA |
8.5 |
8 |
8 |
* Shading indicates positions funded from
this account. |
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
Tons of concrete placed |
NA |
1,312 |
1,400 |
1,400 |
Linear feet of curb and gutter
replaced |
NA |
29,713 |
25,000 |
25,000 |
|
|
|
|
|
|
|
|
|
|
|
|
Ave. response time for street repair requests |
|
|
|
ratio of repaired street/total streets |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|