Recommendations/Options/Action Requested: |
|
|||||||||||||||||||||||||||||||||||||||||
|
Adopt Resolution No. 7246, declaring the City’s intent to issue General Obligation Bonds in the amount of $950,000 for the design and construction of Louisiana Street from 12th Street to 13th Street (CIP Project No. PW18E8), and improvements to 23rd Street from Massachusetts Street to Louisiana Street (CIP Project No. PW18E10). |
|
|||||||||||||||||||||||||||||||||||||||||
|
Executive Summary: |
This summer the City will complete two CIP projects that are partially funded with general obligation bonds; Louisiana Street from 12th to 13th and 23rd Street from Massachusetts to Louisiana. Final plan estimates for these projects are projected to exceed amounts previously adopted in the 2018 CIP Budget. The Louisiana Street project was budgeted for $350,000 in general obligation bonds. Bid averages from 2018 construction projects predict costs for this project to be higher than what was originally budgeted. Staff recommends increasing the budget by $100,000 for a budgeted amount of $450,000.
The 23rd Street project was budgeted for $200,000 in general obligation bonds. Mill/overlay limits were extended by 1200 SY on the west end of the project and 5300 SY on the east end to include areas with known base failures. Full depth patching estimates have been increased to account for this added work. Sidewalk ramp repairs at the intersections of Louisiana St., Massachusetts St., New Hampshire St., Rhode Island St., and Barker Ave. have been added to the project scope as well. Some of these ramps in the corridor will require the installation of new pedestrian push button detectors. Additional easement acquisition for these sidewalk and ramp installations will be needed. Staff recommends increasing the budget by $300,000 for a new budgeted amount of $500,000 to complete the additional mill/overlay work and sidewalk repairs. These changes will formally occur with the 2018 budget amendment in July. The City has debt authority to issue these changes prior to the budget amendment.
Project details include:
|
|||||||||||||||||||||||||||||||||||||||||
|
Strategic Plan Critical Success Factor |
Safe, Healthy, and Welcoming Neighborhoods Innovative Infrastructure and Asset Management Sound Fiscal Stewardship Collaborative Solutions |
|||||||||||||||||||||||||||||||||||||||||
|
Fiscal Impact (Amount/Source): |
Resolution No. 7246 authorizes the issuance of General Obligation Bonds in the total amount of $950,000 for Louisiana Street and 23rd Street improvements. |
|||||||||||||||||||||||||||||||||||||||||
|